Inspections for the day of: Friday, October 13, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02459 BLD-Framing/Rough-in10/12/200010/13/200010/13/2000 12:00:00 AMAPART
Boyd ###-#### or ###-####; done late pm 10-12... ok pend plbg , non plbg area 10/12/2000 4:55:12 PM s ok 10/12/2000 4:55:34 PM
BLD98-02583 BLD-Foundation10/11/200010/13/200010/13/2000 12:00:00 AMAPART
Steve ###-####; 10/12/2000 4:02:32 PM walls ok pend spec insp report 10/12/2000 4:02:44 PM
BLD00-02092 BLD-Final10/12/200010/13/200010/13/2000 12:00:00 AMPPASS
###-####, l/c issued 10/13/2000 12:46:40 PM
BLD00-00269 BLD-Final10/12/200010/13/200010/13/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/12/2000 at 16:11:30. Contact: ###-####.card to contractor. 10/13/2000 4:11:38 PM
BLD00-01820 BLD-Wall cover10/12/200010/13/200010/13/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/12/2000 at 19:20:14. Contact: ###-####.has htg c/n, chk at final. ok to insul...chk fnd ins at final 10/13/2000 12:40:44 PM
BLD00-02385 BLD-Final10/13/200010/13/200010/13/2000 12:00:00 AMPFAIL
paper work will be on site rob ###-####; c/n, grid, door, accessibility, etc. 10/13/2000 3:25:35 PM
BLD00-02357 BLD-Energy code compliance10/13/200010/13/200010/13/2000 12:00:00 AMPPART
dwayne ###-#### chk floor at final 10/13/2000 12:51:25 PM
BLD00-01177 BLD-Final10/13/200010/13/200010/13/2000 12:00:00 AMPFAIL
###-####; c/n air seal...crawl access. 10/13/2000 4:41:35 PM
BLD00-00048 BLD-Conference10/13/200010/13/200010/13/2000 12:00:00 AMPPASS
Added by Inspector: 340 On 10/13/2000 w/ supt re c/n of 10-12...detail to be onsite; need furthter info re grease duc/shaft.
BLD00-02058 BLD-Framing/Rough-in10/13/200010/13/200010/13/2000 12:00:00 AMPPART
Added by Inspector: 340 On 10/13/2000 shear ok