Inspections for the day of: Friday, October 13, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-03475 Final10/12/200010/13/200010/13/2000 12:00:00 AMAPART
greg ###-#### need 3" clear at front of furn..gas done by int mtn gas 10/13/2000 9:20:00 AM
MEC99-04311 Rough-in10/12/200010/13/200010/13/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/12/2000 at 15:43:08. Contact: ###-####. excluding b-vent 10/13/2000 10:15:35 AM
MEC00-03473 Rough-in10/12/200010/13/200010/13/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 10/12/2000 at 11:38:27. Contact: ###-####.
MEC00-03482 Final10/12/200010/13/200010/13/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/12/2000 at 11:55:11. Contact: ###-####. 2-3rd floors 10/13/2000 10:15:55 AM
MEC00-03318 Pressure Test10/12/200010/13/200010/13/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/12/2000 at 14:12:04. Contact: ###-####. 3rd floor fail 10/13/2000 10:14:58 AM
MEC00-03442 Final10/12/200010/13/200010/13/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 10/12/2000 at 14:31:55. Contact: ###-####...###-#### 10/13/2000 12:45:24 PM
MEC00-03424 Pressure Test10/13/200010/13/200010/13/2000 12:00:00 AMPPASS
reinspection on gas test ###-####
MEC00-03433 Rough-in10/13/200010/13/200010/13/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/13/2000 at 08:32:30. Contact: ###-####. need 2"clear above top of f/p vent 10/13/2000 1:24:47 PM
MEC00-03400 Final10/13/200010/13/200010/13/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/13/2000 at 10:48:58. Contact: ###-####... 10/13/2000 12:46:54 PM
MEC00-03500 Final10/13/200010/13/200010/13/2000 12:00:00 AMPPASS
FN CALL 1ST BEFORE INSP --###-#### PATRICIA done by 408 10/13/2000 12:49:54 PM
MEC00-03504 Final10/13/200010/13/200010/13/2000 12:00:00 AMPNR
late pm please boiler only Sharon ###-####
MEC00-03487 Pressure Test10/13/200010/13/200010/13/2000 12:00:00 AMPPASS
Added by Inspector: 411 On 10/13/2000