BLD03-02204
| BLD-Grading Inspection | 10/13/2003 | 10/13/2003 | 10/13/2003 12:00:00 AM | | PASS |
|
|
Footing subgrade approved by geotechnical engineer.
|
BLD03-02208
| BLD-Grading Inspection | 10/13/2003 | 10/13/2003 | 10/13/2003 12:00:00 AM | | PASS |
|
|
Footing subgrade approved by the geotechnical engineer.
|
BLD03-01792
| BLD-Grading Inspection | 10/13/2003 | 10/13/2003 | 10/13/2003 12:00:00 AM | | PASS |
|
|
Footing subgrade approved by geotech except for one small area on eastern footing line that had a soft spot to 6 inches that must be removed. Inspector must field verify removal of soft material.
|