ELE05-00978
| ELE-Aging Inspection | 10/13/2005 | 10/13/2005 | 10/14/2005 3:50:07 PM | | NH |
|
|
called and left message
|
ELE05-02290
| Final | 10/13/2005 | 10/13/2005 | 10/13/2005 4:05:00 PM | P | PASS |
|
|
loren Note: Inspection after 4:00 pm if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
ELE05-01295
| Electrical Rough-In | 10/13/2005 | 10/13/2005 | 10/13/2005 3:20:37 PM | P | PART |
|
|
mark Note: ceiling cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles phase 1 ok
|
ELE05-01631
| Electrical Rough-In | 10/12/2005 | 10/13/2005 | 10/13/2005 2:52:54 PM | P | PART |
|
|
joel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles anop
|
ELE05-03728
| Electrical Rough-In | 10/13/2005 | 10/13/2005 | 10/13/2005 2:15:06 PM | P | PART |
|
|
suite 102-Need inspection for cover of walls - installation is ready! as per plans thank you ; Phone #: ###-#### Internet Inspection Request from: dennis mcneely walls ok
|
ELE05-02568
| Electrical Rough-In | 10/11/2005 | 10/13/2005 | 10/13/2005 2:00:15 PM | P | CANC |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles not ready
|
ELE05-03710
| Permanent Service | 10/11/2005 | 10/13/2005 | 10/13/2005 1:23:32 PM | P | PASS |
|
|
mitch ###-#### Grounding and disconnect ok must still check new sub panel and J-box inside. P/S O/H R Ok
|
ELE05-03621
| Final | 10/10/2005 | 10/13/2005 | 10/13/2005 11:39:12 AM | A | PASS |
|
|
install receptacle on roof for satellite heater with faceless gfci above panel for reset purposes. roof access is in the back near the bathroom. please call ###-#### at least 30 minutes ahead of time so that we can meet you there and provide you with an 8 ft. ladder to access the roof hatch. Thanks Bob!!! -Mark-; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE05-02931
| Electrical Rough-In | 10/12/2005 | 10/13/2005 | 10/13/2005 10:46:02 AM | A | PASS |
|
|
CONTACT: NEIL RAMSEY; Phone #: ###-#### Internet Inspection Request from: Deb McCoy total R/I finished
|
ELE05-02402
| Final | 10/12/2005 | 10/13/2005 | 10/13/2005 10:28:11 AM | A | NR |
|
|
###-#### general was installing a new kitchen floor and had removed cabinets so I was unable to do a complete inspection at this time. I called the contractor about reschedualing and garage GFCIs and outside recep cover not fitting with the recep.
|
ELE05-02707
| ELE-Aging Inspection | 10/13/2005 | 10/13/2005 | 10/13/2005 9:39:57 AM | | DONE |
|
|
|
ELE05-02537
| ELE-Aging Inspection | 10/13/2005 | 10/13/2005 | 10/13/2005 9:38:02 AM | | NR |
|
|
suc
|
ELE05-03726
| Electrical Rough-In | 10/12/2005 | 10/13/2005 | 10/13/2005 9:36:43 AM | A | PART |
|
|
###-#### - paul 2nd floor ok
|
ELE05-01205
| Final | 10/12/2005 | 10/13/2005 | 10/13/2005 8:59:50 AM | A | NH |
|
|
pat lass called contractor and left card and notice
|
ELE05-01293
| Electrical Rough-In | 10/12/2005 | 10/13/2005 | 10/13/2005 8:02:30 AM | A | PART |
|
|
jeramiah ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie bathroom shell and core on 2nd floor anop by br
|
ELE05-03726
| Permanent Service | 10/13/2005 | 10/13/2005 | 10/13/2005 12:00:00 AM | P | PASS |
|
|
###-#### - paul P/S O/H R Ok
|
ELE05-02707
| DOC - Permit Finaled | 10/13/2005 | 10/13/2005 | 10/13/2005 12:00:00 AM | P | PASS |
|
|
done
|