Inspections for the day of: Tuesday, October 13, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00622 Site Preparation10/13/200910/13/200910/14/2009 10:42:00 AM PASS
ESC09-00086 BMP Violation10/8/200910/13/200910/14/2009 6:57:07 AMAFAIL
Verbal to RP:
Correction Notice
1. Clean up all hard surfaces of all sediment and debris.
2. Maintain all storm drain inlets affected by the construction project.
3. Clean up all trash debris within the project area by removing or placing into a container. (Wood is exempt)
Failure to comply will result in a stop work order. Will re-inspect on 10/14/09am.
ESC09-00021 BMP Violation10/8/200910/13/200910/13/2009 12:31:05 PMAFAIL
Message to RP:
Correction Notice:
Restabilize construction exit with a top coat of 2" washed rock. Failure to comply will result in a stop work order will re-inspect on 10/14/09PM.
ESC07-01014 DOC - Permit Finaled10/13/200910/13/200910/13/2009 11:45:32 AMPPASS
ESC09-00563 Site Preparation10/13/200910/13/200910/13/2009 11:41:19 AM CANC
RP out till 10/15/09. Will re-inspect on 10/15/09 to recieve access into plant.
ESC08-00952 BMP Violation10/13/200910/13/200910/13/2009 11:32:18 AMAFAIL
Verbal to RP:
Correction Notice
1. Clean up all hard surfaces of all sediment and debris.
2. Maintain all storm drain inlets affected by the site developement.
3. Clean up all trash debris in developent area by removing or placing into a container.
Failure to comply will result in a stop work order. Will re-inspect on 10/14/09am.
ESC09-00594 General Inspection10/13/200910/13/200910/13/2009 8:38:44 AMAFAIL
Verbal to RP:
2.Install a external sediment barrier surounding the storm drain inlet at the south west end of the project area where stockpiles of pit run is located.
3. Discussed over the use of a stabilized construction exit off of the disturbed area of the project. Recommend that all equipment to stay on the disturbed area and to have all other material and vechiles stay on the parking lot. If any tracking occur, they will be required to install a stabilized construction exit per city standards with access controls. Will re-inspect on 10/16/09 am.
ESC09-00377 Site Final10/13/200910/13/200910/13/2009 8:29:40 AMAPASS
ESC07-01010 DOC - Permit Finaled10/13/200910/13/200910/13/2009 7:23:39 AMAPASS