PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, October 13, 2009
.
Number of inspections:
9
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00622
Site Preparation
10/13/2009
10/13/2009
10/14/2009 10:42:00 AM
PASS
ESC09-00086
BMP Violation
10/8/2009
10/13/2009
10/14/2009 6:57:07 AM
A
FAIL
Verbal to RP:
Correction Notice
1. Clean up all hard surfaces of all sediment and debris.
2. Maintain all storm drain inlets affected by the construction project.
3. Clean up all trash debris within the project area by removing or placing into a container. (Wood is exempt)
Failure to comply will result in a stop work order. Will re-inspect on 10/14/09am.
ESC09-00021
BMP Violation
10/8/2009
10/13/2009
10/13/2009 12:31:05 PM
A
FAIL
Message to RP:
Correction Notice:
Restabilize construction exit with a top coat of 2" washed rock. Failure to comply will result in a stop work order will re-inspect on 10/14/09PM.
ESC07-01014
DOC - Permit Finaled
10/13/2009
10/13/2009
10/13/2009 11:45:32 AM
P
PASS
ESC09-00563
Site Preparation
10/13/2009
10/13/2009
10/13/2009 11:41:19 AM
CANC
RP out till 10/15/09. Will re-inspect on 10/15/09 to recieve access into plant.
ESC08-00952
BMP Violation
10/13/2009
10/13/2009
10/13/2009 11:32:18 AM
A
FAIL
Verbal to RP:
Correction Notice
1. Clean up all hard surfaces of all sediment and debris.
2. Maintain all storm drain inlets affected by the site developement.
3. Clean up all trash debris in developent area by removing or placing into a container.
Failure to comply will result in a stop work order. Will re-inspect on 10/14/09am.
ESC09-00594
General Inspection
10/13/2009
10/13/2009
10/13/2009 8:38:44 AM
A
FAIL
Verbal to RP:
2.Install a external sediment barrier surounding the storm drain inlet at the south west end of the project area where stockpiles of pit run is located.
3. Discussed over the use of a stabilized construction exit off of the disturbed area of the project. Recommend that all equipment to stay on the disturbed area and to have all other material and vechiles stay on the parking lot. If any tracking occur, they will be required to install a stabilized construction exit per city standards with access controls. Will re-inspect on 10/16/09 am.
ESC09-00377
Site Final
10/13/2009
10/13/2009
10/13/2009 8:29:40 AM
A
PASS
ESC07-01010
DOC - Permit Finaled
10/13/2009
10/13/2009
10/13/2009 7:23:39 AM
A
PASS