BLD14-02302
| BLD-Footing | 10/13/2014 | 10/13/2014 | 10/14/2014 10:06:44 AM | P | PASS |
|
|
Matt Phone #: ###-####
|
GCB14-00064
| GCB-Shearwall | 10/13/2014 | 10/13/2014 | 10/13/2014 3:10:04 PM | P | PASS |
|
|
Mike ###-#### drywall shear, plans on furnace
|
GCB14-00140
| GCB-Fndatn/slab ins/fld vent | 10/13/2014 | 10/13/2014 | 10/13/2014 2:28:26 PM | P | PASS |
|
|
Juron ###-#### foundation
|
BLD14-02626
| BLD-Wall Bracing | 10/10/2014 | 10/13/2014 | 10/13/2014 2:27:46 PM | P | PART |
|
|
Partial shear for porch - Vince Phone #: ###-#### OK
|
BLD14-02215
| BLD-Framing/Rough-in | 10/10/2014 | 10/13/2014 | 10/13/2014 1:24:43 PM | A | PART |
|
|
Doug Phone #: ###-#### Inspected 2 layers and hat channel at 2 hr floor/ceiling assemb.....
|
BLD13-02973
| BLD-Framing/Rough-in | 10/10/2014 | 10/13/2014 | 10/13/2014 1:23:04 PM | A | PART |
|
|
Russ Phone #: ###-#### Walls, Stairs and ramps around and behind stage.
|
BLD14-01735
| BLD-Footing | 10/10/2014 | 10/13/2014 | 10/13/2014 12:24:50 PM | A | PASS |
|
|
Wes Phone #: ###-####
|
BLD14-02839
| BLD-Foundation | 10/10/2014 | 10/13/2014 | 10/13/2014 12:23:44 PM | A | PASS |
|
|
Wes Phone #: ###-####
|