ELE13-01285
| ELE-Aging Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 1:29:01 PM | | DONE |
|
|
did drive by final ok
|
ELE13-01285
| Final | 10/13/2015 | 10/13/2015 | 10/13/2015 1:28:17 PM | P | PASS |
|
|
finalok did drive by
|
ELE13-01214
| ELE-Aging Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 1:22:08 PM | | DONE |
|
|
Greg will call this in soon
|
ELE15-03252
| Electrical Rough-In | 10/13/2015 | 10/13/2015 | 10/13/2015 1:10:11 PM | P | PASS |
|
|
Underground inspection Contact Travis @ ###-#### Phone #: ###-#### Inspection requested via web by Cathy Duchek u.ground secondary to temp. service ok to cover
|
ELE15-03278
| Electrical Rough-In | 10/12/2015 | 10/13/2015 | 10/13/2015 10:53:35 AM | A | PASS |
|
|
Concrete encased electrode inspection. Phone #: ###-#### Inspection requested via web by Andy Rose r/i grounding electrode ok
|
ELE15-03288
| Final | 10/12/2015 | 10/13/2015 | 10/13/2015 10:39:44 AM | A | FAIL |
|
|
Pam Carlson is the owner should you need access. Phone #: ###-#### Inspection requested via web by sam petterson wiring to heat pump ok wiring from heat pump to air handelers wired with TC-ER cable ran by TML. NEC 400.8(1)-flexable cords and cables shall not be used as a substitute for permenent wiring of a structure. OK if sleeved with raceway. This electrical work needs to be done by licensed electrical contractor.
|
ELE15-03118
| Electrical Rough-In | 10/12/2015 | 10/13/2015 | 10/13/2015 9:55:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Harvey Reyna r/i ok as per ERIC S. plumbing permits pulled
|
ELE15-02822
| Conference | 10/12/2015 | 10/13/2015 | 10/13/2015 9:43:25 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams discuss bonding and grounding electrode conductor for new service for 111 and 139. Asked Jim to drive 2 ground rods at each service and bond fire sprinkeler risers and sections of copper plumbing piping nearest service. OK to bring grounding electrode conductors into termination cabinet with nuetral disconnect link installed by factory.
|
GCE15-00141
| GCE-Rough-In | 10/12/2015 | 10/13/2015 | 10/13/2015 8:58:43 AM | A | PASS |
|
|
###-#### r/i floor heat upst. ok
|
GCE15-00144
| GCE-Final | 10/12/2015 | 10/13/2015 | 10/13/2015 8:44:15 AM | A | PASS |
|
|
Jess ###-#### final ok
|
ELE15-00830
| Electrical Rough-In | 10/12/2015 | 10/13/2015 | 10/13/2015 7:43:39 AM | P | CANC |
|
|
Contact: Jeremiah Goins - Final inspection for the 3rd floor please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Inspection cancelled from web by: Deb Gooden
|
ELE16-01838
| Electrical Rough-In | 10/12/2015 | 10/13/2015 | 10/13/2015 12:00:00 AM | A | PASS |
|
|
SHQ Lvl 6 Z 1,2,3 Room 202,203,210 Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok level 6 zone 2 and 3 (100% on slab on deck complete for all levels. r/i walls ok in rms. 202,203 and 210
|