Inspections for the day of: Tuesday, October 13, 2015.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GCB15-00101 GCB-Framing10/13/201510/13/201510/13/2015 4:15:51 PMPFAIL
Willie ###-####. Complete all lateral bracing, fire blocl at concealed area ar ceiling in main entry, windows next to fireplace are required to be tempered. A correction notice was issued.
GCB15-00048 GCB-Energy10/13/201510/13/201510/13/2015 3:47:35 PMPPASS
Manny ###-####
GCB14-00129 GCB-Shearwall10/13/201510/13/201510/13/2015 3:08:45 PMPPASS
Grey ###-####
GCB14-00129 GCB-Framing10/13/201510/13/201510/13/2015 3:07:42 PMPCANC
Grey ###-####
BLD15-03710 BLD-Conference10/13/201510/13/201510/13/2015 2:48:33 PMPDONE
Hans Phone #: ###-####
BLD15-03710 BLD-Framing/Rough-in10/13/201510/13/201510/13/2015 2:47:57 PMPPASS
Hans Phone #: ###-####
BLD15-00054 BLD-Final10/13/201510/13/201510/13/2015 2:31:17 PMPFAIL
. Provide a zoning final. Install the vertical grab bars in both restrooms. new p.o.s. and self serve counters are not ADA accessible. A correction notice has been issued. This business opened for bussiness without these last two inspections.
BLD15-00248 BLD-Framing/Rough-in10/13/201510/13/201510/13/2015 1:58:26 PMPPASS
Pat Phone #: ###-####
BLD15-01259 BLD-Energy code compliance10/13/201510/13/201510/13/2015 1:31:31 PMPPART
Needs to complete insulation at electrical room wall and complete foam seal on top plates for fireblock.
BLD15-03161 BLD-Footing10/13/201510/13/201510/13/2015 1:15:11 PMPNR
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. pad not excavated, no forms or workers on site.
MIS15-00258 DOC - Permit Finaled10/13/201510/13/201510/13/2015 11:10:13 AMPPASS
Coach has been removed site clean, no one around.
BLD15-03657 BLD-Footing10/12/201510/13/201510/13/2015 11:09:28 AMAPASS
Art Phone #: ###-####
BLD15-03728 BLD-Footing10/12/201510/13/201510/13/2015 10:33:58 AMAPART
Bill Phone #: ###-####
BLD15-02563 BLD-Foundation10/12/201510/13/201510/13/2015 9:53:58 AMAPASS
Manuel Phone #: ###-####
BLD15-02565 BLD-Footing10/12/201510/13/201510/13/2015 9:53:34 AMAPASS
Manuel Phone #: ###-####
BLD15-02564 BLD-Foundation10/12/201510/13/201510/13/2015 9:53:04 AMAPASS
Manuel Phone #: ###-####
BLD15-02559 BLD-Energy code compliance10/12/201510/13/201510/13/2015 9:52:16 AMAPASS
Insulation // Rob Phone #: ###-####. Rigid insulation on stemwall ok.
BLD15-00054 BLD-Final10/12/201510/13/201510/13/2015 9:26:40 AMANR
Crasmo-please call to meet Phone #: ###-####. No access to approved plans. waited for 25 minutes for manager. Noted probable issues with ADA countertops at point of service and self serve areas. Also needs zoning sign off. Gave contravtor contact info to schedule zoning final.
BLD15-00244 BLD-Foundation10/12/201510/13/201510/13/2015 8:47:40 AMAPASS
John Phone #: ###-####
BLD15-01259 BLD-Energy code compliance10/12/201510/13/201510/13/2015 8:32:26 AMANR
James Phone #: ###-####. MOved to pm.