Inspections for the day of: Tuesday, October 13, 2015.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00556 Conference10/12/201510/13/201510/14/2015 4:04:53 PMPPEND
dust control stabilization on Highland Valley Road
ESC15-00210 General Inspection10/13/201510/13/201510/13/2015 4:48:41 PM PASS
WIP. Near completion. Yard is not yet stabilized. No sediment leaving site, no stormwater pollution sources uncontained on site observed.
ESC15-00862 General Inspection10/13/201510/13/201510/13/2015 4:07:49 PMPPASS
WIP. BMP installed. Site housekeeping (sweeping & trash containment) has been good throughout project. No corrections needed at this time.
ESC15-00572 Site Final10/13/201510/13/201510/13/2015 3:49:36 PMPPASS
Work complete, yard is landscaped, and sidewalk and gutter have been cleaned. Temp BMPs in Somerset are to remain for active SFH by Jayo Construction.
ESC15-00623 General Inspection10/13/201510/13/201510/13/2015 3:41:52 PMPPASS
WIP. Perimeter fiber wattles are still installed and trenched in. No sediment leaving site to sidewalks or gutters.

Tracking pad BMP has been installed at entrance, permit is posted, and trash and materials are contained on site. No issues, no corrections requested. Approved.
ESC15-00541 Aging Inspection10/13/201510/13/201510/13/2015 3:40:30 PM PASS
No subdivision issues at Hackberry Ranch. No hillside erosion areas observed, sediment controls are installed, and re-planted vegetation has established.

Only one active SFH in progress. No trackout or discharges (see ESC15-00623). Approved.
ESC13-00755 General Inspection10/13/201510/13/201510/13/2015 3:12:30 PM PASS
WIP. Phase I is fully complete and reportedly 80% occupied. Nearly all grounds are landscaped and in the process of being cleaned.

RP JC informed me that laydown yard deactivation and completion of project is scheduled for Dec. 1st.

Syman Co. has been ordered by Ada Sand & Gravel/Petra to pull all DIs in phase I asap as it is stabilized and do not want to cause drainage issues with Fall leaves.

Approved. No violations observed, no complaints or issues received.
ESC15-00236 Aging Inspection10/13/201510/13/201510/13/2015 2:41:06 PM PASS
Construction and post construction landscaping and stabilization complete. Temp BMPs to remain for continued SFH work in DHE#12
ESC15-00236 DOC - Permit Finaled10/13/201510/13/201510/13/2015 2:40:22 PMPPASS
ESC15-00550 DOC - Permit Finaled10/13/201510/13/201510/13/2015 2:19:03 PMPPASS
ESC15-00550 Aging Inspection10/13/201510/13/201510/13/2015 2:18:58 PM PASS
Work complete. Site cleaned and stabilized. All permits finaled.
ESC15-00180 General Inspection10/13/201510/13/201510/13/2015 1:16:10 PM PASS
WIP. Some minor trackout due to active curbing and road work. Sweep up will be after completion and paving. No fugitive dust observed or complaints received. No offsite discharges, uncontained trash, or loose sediment leaving site. Most of the distrubed area is surrounded by cement curbing. No corrections issued.
ESC15-01078 Site Preparation10/12/201510/13/201510/13/2015 12:00:33 PMAPASS
Brett Phone #: ###-####

Ready for excavation. Permit posted. DI has sediment protection. Approved.
ESC15-00276 Site Final10/13/201510/13/201510/13/2015 11:26:29 AMPPASS
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
ESC15-00275 Site Final10/13/201510/13/201510/13/2015 11:25:48 AMPPASS
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
ESC15-00270 Site Final10/13/201510/13/201510/13/2015 11:24:54 AMPPASS
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
ESC15-00270 Site Preparation10/13/201510/13/201510/13/2015 11:24:24 AMPCANC
ESC15-00278 Site Final10/13/201510/13/201510/13/2015 11:23:24 AMPPASS
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
ESC15-00266 Site Final10/13/201510/13/201510/13/2015 11:22:44 AMPPASS
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permi finaled.
ESC15-00555 Aging Inspection10/13/201510/13/201510/13/2015 11:06:54 AM PASS
WIP by homeowner RP. No materials spills, trackout, or sediment runoff occuring. Using vegetated yard as staging area, work is occuring in backyard. Permit sign posted in front window.
ESC15-00196 General Inspection10/13/201510/13/201510/13/2015 10:10:13 AM PASS
Old home damaged by fire demolished, new SFH is complete. Yard is landscaped and stabilized, no loose sediment or materials . ESC permit conditions satisfied.

Note BLD for house closed, BLD for demo still open.
ESC15-00196 DOC - Permit Finaled10/13/201510/13/201510/13/2015 10:08:58 AMPPASS
ESC15-00720 Random Inspection10/13/201510/13/201510/13/2015 9:56:24 AMPPASS
Street and sidewalk clean, perimeter wattle installed. Permit sign posted. No activity at time of inspection. Approved.
ESC14-00135 General Inspection10/13/201510/13/201510/13/2015 8:47:39 AM PASS
Home complete, landscaped, and occupied. Permit open to monitor re-seeding and installation of temporary wattle to the right of the house where equipment and landscpaing access was created. JH Development stated will be stabilizing within the next 2 weeks and is waiting for forecasted precipitation. No active sediment runoff or issues at site.