ESC15-00556
| Conference | 10/12/2015 | 10/13/2015 | 10/14/2015 4:04:53 PM | P | PEND |
|
|
dust control stabilization on Highland Valley Road
|
ESC15-00210
| General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 4:48:41 PM | | PASS |
|
|
WIP. Near completion. Yard is not yet stabilized. No sediment leaving site, no stormwater pollution sources uncontained on site observed.
|
ESC15-00862
| General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 4:07:49 PM | P | PASS |
|
|
WIP. BMP installed. Site housekeeping (sweeping & trash containment) has been good throughout project. No corrections needed at this time.
|
ESC15-00572
| Site Final | 10/13/2015 | 10/13/2015 | 10/13/2015 3:49:36 PM | P | PASS |
|
|
Work complete, yard is landscaped, and sidewalk and gutter have been cleaned. Temp BMPs in Somerset are to remain for active SFH by Jayo Construction.
|
ESC15-00623
| General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 3:41:52 PM | P | PASS |
|
|
WIP. Perimeter fiber wattles are still installed and trenched in. No sediment leaving site to sidewalks or gutters.
Tracking pad BMP has been installed at entrance, permit is posted, and trash and materials are contained on site. No issues, no corrections requested. Approved.
|
ESC15-00541
| Aging Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 3:40:30 PM | | PASS |
|
|
No subdivision issues at Hackberry Ranch. No hillside erosion areas observed, sediment controls are installed, and re-planted vegetation has established.
Only one active SFH in progress. No trackout or discharges (see ESC15-00623). Approved.
|
ESC13-00755
| General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 3:12:30 PM | | PASS |
|
|
WIP. Phase I is fully complete and reportedly 80% occupied. Nearly all grounds are landscaped and in the process of being cleaned.
RP JC informed me that laydown yard deactivation and completion of project is scheduled for Dec. 1st.
Syman Co. has been ordered by Ada Sand & Gravel/Petra to pull all DIs in phase I asap as it is stabilized and do not want to cause drainage issues with Fall leaves.
Approved. No violations observed, no complaints or issues received.
|
ESC15-00236
| Aging Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 2:41:06 PM | | PASS |
|
|
Construction and post construction landscaping and stabilization complete. Temp BMPs to remain for continued SFH work in DHE#12
|
ESC15-00236
| DOC - Permit Finaled | 10/13/2015 | 10/13/2015 | 10/13/2015 2:40:22 PM | P | PASS |
|
|
|
ESC15-00550
| DOC - Permit Finaled | 10/13/2015 | 10/13/2015 | 10/13/2015 2:19:03 PM | P | PASS |
|
|
|
ESC15-00550
| Aging Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 2:18:58 PM | | PASS |
|
|
Work complete. Site cleaned and stabilized. All permits finaled.
|
ESC15-00180
| General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 1:16:10 PM | | PASS |
|
|
WIP. Some minor trackout due to active curbing and road work. Sweep up will be after completion and paving. No fugitive dust observed or complaints received. No offsite discharges, uncontained trash, or loose sediment leaving site. Most of the distrubed area is surrounded by cement curbing. No corrections issued.
|
ESC15-01078
| Site Preparation | 10/12/2015 | 10/13/2015 | 10/13/2015 12:00:33 PM | A | PASS |
|
|
Brett Phone #: ###-####
Ready for excavation. Permit posted. DI has sediment protection. Approved.
|
ESC15-00276
| Site Final | 10/13/2015 | 10/13/2015 | 10/13/2015 11:26:29 AM | P | PASS |
|
|
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
|
ESC15-00275
| Site Final | 10/13/2015 | 10/13/2015 | 10/13/2015 11:25:48 AM | P | PASS |
|
|
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
|
ESC15-00270
| Site Final | 10/13/2015 | 10/13/2015 | 10/13/2015 11:24:54 AM | P | PASS |
|
|
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
|
ESC15-00270
| Site Preparation | 10/13/2015 | 10/13/2015 | 10/13/2015 11:24:24 AM | P | CANC |
|
|
|
ESC15-00278
| Site Final | 10/13/2015 | 10/13/2015 | 10/13/2015 11:23:24 AM | P | PASS |
|
|
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permit finaled.
|
ESC15-00266
| Site Final | 10/13/2015 | 10/13/2015 | 10/13/2015 11:22:44 AM | P | PASS |
|
|
Townhome complete. Materials staged in access alley have been swept and cleaned. All work on east side (7 townhomes) of Hope Ridge is complete. Interior work ongoing on west side of block and ESC permits open. ESC permi finaled.
|
ESC15-00555
| Aging Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 11:06:54 AM | | PASS |
|
|
WIP by homeowner RP. No materials spills, trackout, or sediment runoff occuring. Using vegetated yard as staging area, work is occuring in backyard. Permit sign posted in front window.
|
ESC15-00196
| General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 10:10:13 AM | | PASS |
|
|
Old home damaged by fire demolished, new SFH is complete. Yard is landscaped and stabilized, no loose sediment or materials . ESC permit conditions satisfied.
Note BLD for house closed, BLD for demo still open.
|
ESC15-00196
| DOC - Permit Finaled | 10/13/2015 | 10/13/2015 | 10/13/2015 10:08:58 AM | P | PASS |
|
|
|
ESC15-00720
| Random Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 9:56:24 AM | P | PASS |
|
|
Street and sidewalk clean, perimeter wattle installed. Permit sign posted. No activity at time of inspection. Approved.
|
ESC14-00135
| General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 8:47:39 AM | | PASS |
|
|
Home complete, landscaped, and occupied. Permit open to monitor re-seeding and installation of temporary wattle to the right of the house where equipment and landscpaing access was created. JH Development stated will be stabilizing within the next 2 weeks and is waiting for forecasted precipitation. No active sediment runoff or issues at site.
|