MEC16-02668
| Final | 10/13/2016 | 10/13/2016 | 10/13/2016 4:26:56 PM | P | PASS |
|
|
Inspection requested via web by Dustin Rich
|
MEC16-02501
| Rough-in | 10/13/2016 | 10/13/2016 | 10/13/2016 3:33:26 PM | P | NR |
|
|
Request for cover inspection of 3rd floor. Please contact job lead, Larry, ###-#### with any questions or concerns. Inspection requested via web by Heather Gransbery - 3rd floor capitol south side still not ready
|
MEC16-03376
| Final | 10/13/2016 | 10/13/2016 | 10/13/2016 3:15:35 PM | P | PASS |
|
|
Final Mechanical Inspection - Please contact Jim Brown. TAB Report to be emailed to Chad S. and Bill V. Phone #: ###-#### Inspection requested via web by Melissa Kaae
|
MEC16-03742
| Final | 10/12/2016 | 10/13/2016 | 10/13/2016 12:23:43 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC16-04347
| Final | 10/11/2016 | 10/13/2016 | 10/13/2016 12:09:02 PM | A | FAIL |
|
|
please call home owner prior to going to the home ###-#### Alan Percey Phone #: ###-#### Inspection requested via web by Jeremy lehosit - need electrical service switch at furnace, need co detector installed
|
MEC16-04529
| Pressure Test | 10/12/2016 | 10/13/2016 | 10/13/2016 11:59:23 AM | A | FAIL |
|
|
could you please call jeff so that he can meet you out there at time of inspection, thanks ###-#### Phone #: ###-#### Inspection requested via web by Gary Reeves - Gas piping still not holding pressure
|
MEC16-04305
| Rough-in | 10/13/2016 | 10/13/2016 | 10/13/2016 11:23:44 AM | A | PASS |
|
|
Nat Phone #: ###-#### - 20lb gas pass to fireplace, no equipment set at this time. will check at final.
|
MIS16-00328
| MEC-Conference | 10/12/2016 | 10/13/2016 | 10/13/2016 11:07:26 AM | A | FAIL |
|
|
Michelle// please call ahead Phone #: ###-#### - Need to remove blockage at top of fireplace chimney. Need to replace damaged & degraded gas log lighter, or remove and cap gas line with a gas tight cap.
|
MEC16-01141
| Final | 10/12/2016 | 10/13/2016 | 10/13/2016 10:00:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC16-02481
| Final | 10/12/2016 | 10/13/2016 | 10/13/2016 9:33:53 AM | A | PASS |
|
|
Monte 9724667 Inspection requested via web by william kerwin
|
MEC16-02482
| Final | 10/12/2016 | 10/13/2016 | 10/13/2016 9:33:40 AM | A | PASS |
|
|
Monte9724667 Inspection requested via web by william kerwin
|
MEC16-02501
| Rough-in | 10/12/2016 | 10/13/2016 | 10/13/2016 9:28:25 AM | A | PART |
|
|
Request for cover inspection of entire 3rd floor. Please contact job lead, Larry Halbert, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 3rd floor capitol side okay to cover the lids on the north side of the cooridoor
|
MEC16-02586
| Final | 10/12/2016 | 10/13/2016 | 10/13/2016 8:14:23 AM | A | PASS |
|
|
They are pouring concrete Thursday. if no access into home. Please fail job and we will reinspect. Contractor doesn''t want foot prints. Thanks If we get their before the mud makes it. We''re good to go. Phone #: ###-#### Inspection requested via web by Brian Preece
|
MEC16-04305
| Conference | 10/13/2016 | 10/13/2016 | 10/13/2016 12:00:00 AM | A | CANC |
|
|
Can you call in advanced. I am going to pick up the approved report, first thing in the morning. But, if there is any drama with getting the copy, I assume there is no sense in coming? Phone #: ###-#### >> Inspection requested via web by Nat Golden
|
MEC16-02501
| Rough-in | 10/12/2016 | 10/13/2016 | 10/12/2016 2:26:33 PM | P | CANC |
|
|
Request for cover inspection of 3rd floor. Please contact job lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|