Inspections for the day of: Thursday, October 13, 2016.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00502 INSP-Supply line flush10/13/201610/13/201610/13/2016 3:08:20 PMPPASS
Underground flush passed
BLD16-03742 FIRE-Final Inspection10/13/201610/13/201610/13/2016 3:06:59 PMPFAIL
Repair or remove the non-functional and non-required exit sign/emergency light and provide annual inspection for the fire extinguisher
BLD15-00371 FIRE-Final Inspection10/13/201610/13/201610/13/2016 3:06:15 PMPFAIL
Provide ADA single action hardware as discussed and provide annual inspection for the expired fire extinguishers.
FIR15-00683 INSP-Final Inspection10/11/201610/13/201610/13/2016 1:45:56 PMACANC
Ron Phone #: ###-####
FIR15-00683 INSP-Sprinkler Rough-in/Hydro10/11/201610/13/201610/13/2016 12:30:05 PMAPASS
The overhead hydro tests passed. The forward flush passed. Interior corrections have been made. Need pressure relief valves, signage on bell and alarm interconnects for a final.
BLD16-00628 FIRE-Final Inspection10/12/201610/13/201610/13/2016 11:14:17 AMAFAIL
Life safety is ok but is being held up by issues with the project related fire alarm permit.
FIR16-00357 INSP-Alarm Testing10/12/201610/13/201610/13/2016 11:13:17 AMADONE
Need to add smoke detector in the Nurses Station area, need to relocate two other smoke detectors away from air diffusers, one wall mount strobe was non-functional, audio was not temporal but march time, elevator recall was not tested or any of the new smoke detectors in the corridor system. Scott Arellano is ok with a 30 day temporary to allow time for the contractor to correct the audio as long as all other items have been corrected.
BLD16-02594 FIRE-Final Inspection10/12/201610/13/201610/13/2016 9:54:14 AMAPASS
life safety passed