PLM02-02992
| Final | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | PASS |
|
|
###-#### final ok 10/14/2002 10:06:48 AM
|
PLM02-03121
| Water and/or Sewer | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | PASS |
|
|
###-#### m.h. hook up ok 10/14/2002 8:45:47 AM
|
PLM02-02641
| Water and/or Sewer | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | FAIL |
|
|
grease line test remove reinstalled tee on the grease line and install wye, discharge side of grease interceptor seems to have been reinstalled with grade but no bedding, found large rocks on line , expose and bed call for reinspection, storm drain main is backgraded in vacinity of the replaced 8" rain drain line from tug area. 10/14/2002 9:48:44 AM
|
PLM02-03078
| Sprinkler (Final) | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-00906
| Final | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 14:56:49. Contact: ###-####. TEMP FINAL ON CONC.A needs t&p drain run to the floor sink and c.o. covers installed 10/14/2002 4:20:25 PM
|
PLM02-03131
| Water and/or Sewer | 10/14/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | PASS |
|
|
###-#### sewer replacement final ok 10/14/2002 1:57:33 PM
|
PLM02-03088
| Plumbing Rough-in | 10/14/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 08:37:33. Contact: ###-####.
|
PLM01-02909
| Final | 10/14/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | PASS |
|
|
###-####
|