PLM02-03100
| Sprinkler (Final) | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | FAIL |
|
|
GO THRU THE RIGHT SIDE GATE AND NEAR THE DECK ###-#### LOIS backflow not tested 10/14/2002 9:35:59 PM
|
PLM02-03112
| Plumbing Rough-in | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 13:42:15. Contact: ###-####.
|
PLM02-01362
| Final | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01883
| Final | 10/14/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 07:08:49. Contact: ###-####. need building backflow and water closet seat needs to be open front. 10/14/2002 9:53:48 PM
|
PLM02-03134
| Water and/or Sewer | 10/14/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | PASS |
|
|
brett ###-####
|
PLM02-02962
| Plumbing Rough-in | 10/14/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | NR |
|
|
ready at 3 ###-#### needs to move trap for washing machine to above floor and vent. 10/15/2002 3:37:22 AM
|
PLM02-02549
| Final | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01369
| Final | 10/11/2002 | 10/14/2002 | 10/14/2002 12:00:00 AM | P | PASS |
|
|
###-####
|