ELE04-03159
| Electrical Rough-In | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | PASS |
|
|
###-#### use stairs on the right side of house .go down then around back then up to deck Thank you steve sewell; Phone #: ###-#### Internet Inspection Request from: steven sewell 10/14/2004 8:04:17 AM
|
ELE04-01531
| Final | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | PASS |
|
|
After 10:00 please dan ###-####
|
ELE04-03138
| Rough-In Permanent Service | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | PASS |
|
|
We:1)ran a 20 amp 120 volt circuit in 3/4" IMC in trench to garage and installed a 20 amp rated double pole switch inside the garage as a disconnect switch. 2)wired 2 GFCI protected receptacles inside garage.3)wired 1 switch and ceiling light inside garage.4)wired 2 exterior garage lights and 1 exterior house light on a pair of 3way switches:1 switch in garage and 1 switch inside house(all on this garage circuit).5)wired a weather proof GFCI receptacle on the exterior of the house and fed it from the panel.Thanks!!!!Dan. ; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE04-03165
| Electrical Rough-In | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | PART |
|
|
3 switches were moved. The walls are ok to cover, but all three pipes are not strapped within 3 ft of the ceiling boxes. They will leave the ceiling open on final.
Contact Mel Lacy @###-#### for access and info. 10/14/2004 9:11:35 AM
|
ELE04-02972
| Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | NR |
|
|
We would like a trench inspection between the main building and the small back building as close to noon as possible so we can backfill.Thanks!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE04-03172
| Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
verna- ###-####
|
ELE04-03002
| Conference | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 9:29:01 AM. Contact: ###-####.
talked about adding washer and dryer. 10/14/2004 10:59:06 AM
|
ELE04-01703
| Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
1:30 pm zack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 10/14/2004 10:37:45 AM
RI OK
P/S O/H N OK 10/14/2004 5:56:31 PM
|
ELE04-01666
| Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | NR |
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
3rd floor hall not ready 10/14/2004 2:33:00 PM
|
ELE04-03024
| Final | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
mitch ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
ELE04-03145
| Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PART |
|
|
mitch underground; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
U/G to well OK 10/14/2004 1:50:53 PM
|
ELE04-00990
| Electrical Rough-In | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
Contact Nick; Phone #: ###-#### Internet Inspection Request from: Wendy Waters
R/I Ok 10/14/2004 3:58:42 PM
|
ELE04-02259
| Final | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
George; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
signed Occu card 10/14/2004 11:20:47 AM
|
ELE04-03172
| Permanent Service | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
P/S U/g N Ok
|