BLD04-02353
| BLD-Conference | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | DONE |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles home owner would like to pour foundation in a mono pour insted of footing and stem wall told hem that it is ok but they have to insulate and wall is a min of 12" and 6" above finished grade 10/14/2004 9:17:16 AM
|
BLD03-02878
| BLD-Conference | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | DONE |
|
|
Hi Dave, I would like you and Rick J. to look at a area of concern, not quit sure what to do thanks Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble
|
BLD04-01663
| BLD-Framing/Rough-in | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | PART |
|
|
sandy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ext need to chech phd 2 hold down at frame 10/14/2004 9:00:21 AM
|
BLD04-01612
| BLD-Final | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | FAIL |
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs ada signs at 4th floor restrooms latch side and tp dispensser 2nd floor 10/14/2004 10:37:39 AM
|
BLD04-01718
| BLD-Foundation | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | PART |
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie garage walls ok to pour 10/14/2004 9:44:01 AM
|
MEC04-02698
| Final | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | A | PASS |
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD04-01609
| BLD-Energy code compliance | 10/13/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/13/2004 at 4:36:40 PM. Contact: ###-####.
|
BLD04-01880
| BLD-Foundation | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 7:44:29 AM. Contact: ###-####.
|
BLD03-01830
| BLD-Foundation | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | CANC |
|
|
ceiling grid-- mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD04-01572
| BLD-Framing/Rough-in | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | FAIL |
|
|
david brown ###-#### no inspection done but walked project with framer needs elec r/i and seal package installed 10/14/2004 1:15:58 PM
|
BLD04-02031
| BLD-Framing/Rough-in | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 9:11:06 AM. Contact: ###-####.
|
MEC04-02729
| Rough-in | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
matt ###-####
|
BLD04-01279
| BLD-Framing/Rough-in | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PASS |
|
|
zack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover after elec r/i 10/14/2004 1:36:06 PM
|
BLD03-01830
| BLD-Framing/Rough-in | 10/14/2004 | 10/14/2004 | 10/14/2004 12:00:00 AM | P | PART |
|
|
ceiling grid-- mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 3rd floor ok to drop in ceiling panels after elec sign off
|