ELE05-02584
| Final | 10/14/2005 | 10/14/2005 | 10/14/2005 4:16:49 PM | P | PASS |
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles met with elect to cover recpt cutout in cabinets and fix. ok to final
|
ELE05-02728
| Final | 10/14/2005 | 10/14/2005 | 10/14/2005 3:58:04 PM | P | PASS |
|
|
FINAL INSPECTION; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH corrections made, ok to final, signed occupancy card per structural inspector request.
|
ELE05-02224
| Electrical Rough-In | 10/13/2005 | 10/14/2005 | 10/14/2005 3:55:50 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/13/2005 at 11:32:13 AM. Contact: ###-####. rooftop units ok, noted on plan. wrote correction notice, 410.4(A) fixtures shall be marked suitable for wet locations for outside sconces
|
ELE05-03746
| Temporary Service | 10/14/2005 | 10/14/2005 | 10/14/2005 3:13:18 PM | P | FAIL |
|
|
###-#### - chris called contr, left corr notice, 110.3 there shall be no broken parts, 50a rcpt, fee due.
|
ELE05-03661
| Electrical Rough-In | 10/13/2005 | 10/14/2005 | 10/14/2005 3:11:28 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/13/2005 at 3:14:52 PM. Contact: ###-####. walls ok to cover anop, left green card
|
ELE05-02260
| Electrical Rough-In | 10/13/2005 | 10/14/2005 | 10/14/2005 2:51:29 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/13/2005 at 4:32:04 PM. Contact: ###-####. front soffits ok to cover
|
ELE05-02728
| Final | 10/13/2005 | 10/14/2005 | 10/14/2005 11:43:02 AM | A | FAIL |
|
|
WE ARE READY FOR A FINAL INSPECTION OF THE TENANT IMPROVEMENT. PLEASE FEEL FREE TO ASK FOR KIRK ON SITE IF YOU NEED ACCESS TO ANYTHING. HE IS ON SITE ALL DAY. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH talked to contr, left corr notice, 410.5 fixtures shall have guards near combustible material, 314.29 boxes shall be accessible, 408.4 ckt directory shall be explicit, 110.3 fixtures shall be listed, 250.86 time clock enclosures shall be grounded
|
ELE04-04020
| Electrical Rough-In | 10/14/2005 | 10/14/2005 | 10/14/2005 11:03:50 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/14/2005 at 8:05:35 AM. Contact: ###-####. 2nd stoty hall ceilings ok to cover anop
|
ELE05-03658
| Electrical Rough-In | 10/13/2005 | 10/14/2005 | 10/14/2005 9:15:11 AM | A | PASS |
|
|
cover inspection///shane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover u/g for service and feeder to south bldg
|
ELE05-03446
| Final | 10/14/2005 | 10/14/2005 | 10/14/2005 8:31:41 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/14/2005 at 6:02:39 AM. Contact: ###-####. corr made, told elect to id ceiling wires, ok to final
|
ELE05-02068
| Conference | 10/13/2005 | 10/14/2005 | 10/14/2005 8:11:51 AM | A | DONE |
|
|
early am//rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa looked at placement for subpanel for hot-tub.
|
ELE05-03736
| Temporary Service | 10/13/2005 | 10/14/2005 | 10/14/2005 8:05:08 AM | A | PASS |
|
|
###-#### - brannon t/s u/g n ok
|