MEC05-02660
| Final | 10/13/2005 | 10/14/2005 | 10/17/2005 9:51:44 AM | A | NR |
|
|
|
MEC05-03333
| Pressure Test | 10/14/2005 | 10/14/2005 | 10/14/2005 3:45:20 PM | P | CANC |
|
|
Thayne is contact. Thanks.; Phone #: ###-#### Internet Inspection Request from: Mike Davisson...out of time..i rescheduled this for mon am..i called thayne and let him know
|
MEC02-03799
| Conference | 10/14/2005 | 10/14/2005 | 10/14/2005 3:43:03 PM | P | PASS |
|
|
###-#### russ - request for extension//not really want conference, call russ for info
|
MEC02-03799
| Mec-Request for Extension | 10/14/2005 | 10/14/2005 | 10/14/2005 3:39:49 PM | | PASS |
|
|
###-#### russ
|
MEC05-03327
| Rough-in | 10/13/2005 | 10/14/2005 | 10/14/2005 3:05:47 PM | P | FAIL |
|
|
###-#### - billy Note: Inspect the upstairs before they move up there to remodel downstairs..wrong duct for bath exhausts
|
MEC05-02935
| Rough-in | 10/14/2005 | 10/14/2005 | 10/14/2005 2:26:34 PM | P | PASS |
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MEC05-02935
| Pressure Test | 10/14/2005 | 10/14/2005 | 10/14/2005 2:25:23 PM | P | PASS |
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles...60lb ok
|
MEC05-03276
| Conference | 10/10/2005 | 10/14/2005 | 10/14/2005 1:45:14 PM | A | PASS |
|
|
Contact sean w/ questions ###-####. Thanks!; Phone #: ###-#### Internet Inspection Request from: Roger Patterson
|
MEC05-01757
| Pressure Test | 10/13/2005 | 10/14/2005 | 10/14/2005 9:39:05 AM | A | PASS |
|
|
This is for the in-floor tubing on the 2nd floor; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht...100 lb test ok
|
MEC05-02786
| Rough-in | 10/12/2005 | 10/14/2005 | 10/14/2005 9:11:52 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/12/2005 at 4:12:56 PM. Contact: ###-####.
|
MEC05-02787
| Rough-in | 10/12/2005 | 10/14/2005 | 10/14/2005 9:11:21 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/12/2005 at 4:11:13 PM. Contact: ###-####.
|