BLD13-02833
| FIRE-Final Inspection | 10/11/2013 | 10/14/2013 | 10/14/2013 3:17:23 PM | P | FAIL |
|
|
Correction notice items include; repair non-functional exit signs and EM lights on battery backup, post max occupant load sign at the bar area per review conditions, provide a current annual inspection for the existing fire sprinkler system, verify offsite monitoring of the fire alarm system is current.
|
BLD13-01229
| FIRE-Final Inspection | 10/11/2013 | 10/14/2013 | 10/14/2013 3:13:16 PM | A | PART |
|
|
Missing signage at the main entry/exit, discussed general conditions for life safety inspection.
|
BLD13-01695
| FIRE-Final Inspection | 10/11/2013 | 10/14/2013 | 10/14/2013 3:11:00 PM | A | NR |
|
|
Project related fire sprinkler permit must be finaled prior to building fire life safety approval.
|
FIR13-00541
| INSP-Sprinkler Rough-in | 10/11/2013 | 10/14/2013 | 10/14/2013 3:09:42 PM | A | PART |
|
|
Okay to cover overhead fire sprinkler system modifications at the grid ceilings. Need to provide verification exisitng system is current with an annual inspection.
|