ELE14-02683
| Final | 10/14/2014 | 10/14/2014 | 10/14/2014 2:05:59 PM | P | PASS |
|
|
Back Door Is Open Thank You And Have A Great Day! Phone #: ###-#### Inspection requested via web by jason shifflett Final ok
|
ELE14-02846
| Electrical Rough-In | 10/14/2014 | 10/14/2014 | 10/14/2014 1:55:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark Estep up bed and bath, closet, sitting room rough in ok cover
|
ELE11-02772
| ELE-Aging Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 1:33:46 PM | | DONE |
|
|
Still under construction
|
ELE14-01948
| Electrical Rough-In | 10/14/2014 | 10/14/2014 | 10/14/2014 12:51:45 PM | P | FAIL |
|
|
###-#### Concrete encased rough in. 250.52(A)(3)- South east service, concrete encased will not work do to rebar and 20" of wire located on top of plastic moisture barrier, not tied to footing or foundation rebar. It shall be in direct contact with earth.
|
ELE14-02842
| Rough-In Permanent Service | 10/13/2014 | 10/14/2014 | 10/14/2014 12:17:35 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey 300.4- NM cable shall be installed where not subject to physical damage. Upstairs by return air. 314.3- NM cable shall terminate in a box, laundry rm and out lights
|
ELE14-01948
| Electrical Rough-In | 10/13/2014 | 10/14/2014 | 10/14/2014 10:39:09 AM | A | NR |
|
|
Contact: Jeremy Thornock. Ufer inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Wire removed no rebar in place
|
ELE14-02836
| Final | 10/13/2014 | 10/14/2014 | 10/14/2014 10:18:29 AM | A | FAIL |
|
|
Jason Gaythwaite is our journeyman Contact Phone #: ###-#### Inspection requested via web by Kelly Felin 210.63- A 15 or 20 amp 120 volt receptical outlet shall be installed within 25' of AC unit.
|
ELE14-02841
| Temporary Service | 10/13/2014 | 10/14/2014 | 10/14/2014 10:03:04 AM | A | PASS |
|
|
please call me if their is an issue. thank you! Phone #: ###-#### Inspection requested via web by Robert Schroder t/s o/h n ok
|
ELE14-01848
| Final | 10/13/2014 | 10/14/2014 | 10/14/2014 9:52:08 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Final ok
|
ELE14-02698
| Electrical Rough-In | 10/13/2014 | 10/14/2014 | 10/14/2014 9:21:53 AM | A | PASS |
|
|
Cover for walls, and bathroom ceiling Phone #: ###-#### Inspection requested via web by Stan Woodward Rough in ok cover
|
ELE14-01556
| Conference | 10/14/2014 | 10/14/2014 | 10/14/2014 9:07:30 AM | P | DONE |
|
|
Ladder being added to north side of pool after pool shell completely enclosed check bonding for this ladder for final
|
ELE14-02233
| Permanent Service | 10/13/2014 | 10/14/2014 | 10/14/2014 9:04:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Burke p/s u/g n ok
|
ELE14-01526
| Conference | 10/13/2014 | 10/14/2014 | 10/13/2014 2:24:41 PM | A | DONE |
|
|
Richard Phone #: ###-#### Discussed the attachment of flexible cord to hoist to avoid physical damage.
|