ESC12-01066
| Tracking Control | 10/13/2014 | 10/14/2014 | 10/14/2014 4:46:08 PM | P | PART |
|
|
Yesterdays trackout to Front was cleaned, but parking lot is still unstabilized.
Some sediment still remains in gutter and will need to be swept once parking lot is paved.
|
ESC13-01269
| Tracking Control | 10/14/2014 | 10/14/2014 | 10/14/2014 4:39:36 PM | P | PASS |
|
|
RP had landscapers who caused the trackout to sweep and clean up materials and then had a street sweeper perform a clean up. Approved.
|
ESC14-00938
| Site Preparation | 10/14/2014 | 10/14/2014 | 10/14/2014 3:54:12 PM | P | PASS |
|
|
Tahoe Home is East Valley
Permit posted. EV stormdrain inlets have filter bag protection and lined concrete washout is provided. Site is flat with no surface water. Will need to keep contractors from parking on mud. First home in East Valley. Construction to begin tomorrow.
|
ESC14-00113
| Aging Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 3:43:57 PM | | PASS |
|
|
Home complete, landscaped, and stabilized. ESC condtions satisfied. BLD already finaled.
|
ESC14-00113
| DOC - Permit Finaled | 10/14/2014 | 10/14/2014 | 10/14/2014 3:43:28 PM | P | PASS |
|
|
|
ESC14-00247
| General Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 3:20:28 PM | | PASS |
|
|
Majority of paving/resurfacing work is complete and site is stabilized. WIP on a drainage swale midway through complex. No corrections at this time.
|
ESC14-00171
| Aging Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 2:35:51 PM | | PASS |
|
|
Permit finaed. No ESC violations.
|
ESC14-00171
| DOC - Permit Finaled | 10/14/2014 | 10/14/2014 | 10/14/2014 2:35:37 PM | P | PASS |
|
|
Monument sign complete; ESC conditions satisfied.
|
ESC14-00176
| Aging Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 2:05:53 PM | | PASS |
|
|
Permit finaled.
|
ESC14-00176
| DOC - Permit Finaled | 10/14/2014 | 10/14/2014 | 10/14/2014 2:05:40 PM | P | PASS |
|
|
Pool construction complete and all materials cleaned and disturbed area stabilized. No ESC violations. BLD permit is open with no inspections performed.
|
ESC14-00774
| Site Preparation | 10/14/2014 | 10/14/2014 | 10/14/2014 1:55:01 PM | P | PASS |
|
|
Kyle-please call to meet Phone #: ###-####
Reviewed project and SWPPP with RP Kyle. Will not require the silt fence on west side of site, the existing perimeter is bermed to direct sheet flow inward to the site.
Main BMP will be the stabilized construction entrance which is to be installed tomorrow morning. No MS4 inlets or conveyances receive stormwater from site. Flat; canal on north boundary is in under ground culvert.
Excavation to begin tomorrow. Approved.
|
ESC14-00141
| General Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 1:34:20 PM | | PASS |
|
|
Permits posted, minimal trackout to Wendys parking lot. Site is surrounded by security fencing and initially an entire perimeter or silt fence. Some stretches of silt fence have been replaced by the curbing that has been installed for the new parking lot design. Receiving DIs have filter protection, gutters on Franklin and Milwaukee are free of sediment from site. Approved.
|
ESC14-00938
| Site Preparation | 10/13/2014 | 10/14/2014 | 10/14/2014 11:53:22 AM | A | CANC |
|
|
Clint Phone #: ###-####
rescheduled for PM
|
ESC14-00774
| Site Preparation | 10/13/2014 | 10/14/2014 | 10/14/2014 11:52:22 AM | A | CANC |
|
|
Kyle-please call to meet Phone #: ###-####
Rescheduled for PM
|