BLD15-03013
| FIRE-Final Inspection | 10/14/2015 | 10/14/2015 | 10/14/2015 2:35:57 PM | P | PASS |
|
|
Permit finaled
|
FIR15-00693
| INSP-Final Inspection | 10/13/2015 | 10/14/2015 | 10/14/2015 12:10:14 PM | A | PASS |
|
|
Permit finaled
|
BLD15-03430
| FIRE-Final Inspection | 10/13/2015 | 10/14/2015 | 10/14/2015 10:51:49 AM | A | FAIL |
|
|
Need suite number corrected, need the fire sprinkler system modified and the smoke evac system modifed due to the removal of the ceiling and wall systems. Also the Boise Fire Dept needs to be notified the system has been impaired.
|
BLD15-02788
| FIRE-Final Inspection | 10/13/2015 | 10/14/2015 | 10/14/2015 10:02:46 AM | A | PASS |
|
|
Life safety passed. The contractor needs to provide the correct suite number. Plans show suite 100 and 110 but contractor has physically labeled it 120. This needs to be done and provide verification to the building inspector.
|