BLD19-01048
| BLD-Energy code compliance | 10/12/2019 | 10/14/2019 | 10/14/2019 3:57:59 PM | P | PASS |
|
|
Later the better in the afternoon. Addition is being insulated that morning. Back door will be unlocked. Contact Eric the home owner ###-#### Phone #: ###-#### Inspection requested via web by Eric Mccray
|
BLD19-03229
| BLD-Foundation | 10/14/2019 | 10/14/2019 | 10/14/2019 3:48:54 PM | P | PART |
|
|
Cergo Phone #: ###-####//WIP//need to install hold downs//
|
BLD19-03253
| BLD-Foundation | 10/14/2019 | 10/14/2019 | 10/14/2019 3:48:24 PM | P | PART |
|
|
Cergo Phone #: ###-####//WIP// need to install hold downs//
|
BLD19-03247
| BLD-Foundation | 10/14/2019 | 10/14/2019 | 10/14/2019 3:47:51 PM | P | PART |
|
|
Cergo Phone #: ###-####//WIP//need to install hold downs//
|
BLD19-03248
| BLD-Foundation | 10/14/2019 | 10/14/2019 | 10/14/2019 3:47:18 PM | P | PART |
|
|
Cergo Phone #: ###-####//WIP// need to install hold downs//
|
BLD19-03976
| BLD-Conference | 10/14/2019 | 10/14/2019 | 10/14/2019 2:46:36 PM | P | DONE |
|
|
Initial meeting for basement and hall framing plan. Stair plan as well. Anytime after noon works, call Kyle en route. Thanks. Phone #: ###-#### Inspection requested via web by Kyle Bilinski
|
BLD19-00138
| BLD-Final | 10/10/2019 | 10/14/2019 | 10/14/2019 2:46:17 PM | P | PART |
|
|
Emmanual Phone #: ###-####//temp ok to move equipment in//no card onsite//need verification of accessible restroom from architect-dimensions on plans do not reflect actual//transition is too tall at restroom door//call for final when resolved//
|
BLD19-00536
| BLD-Concrete | 10/9/2019 | 10/14/2019 | 10/14/2019 2:06:26 PM | P | PASS |
|
|
This is for the slab for our clubhouse. The pour actually takes place on Tuesday 10/15/19 at 6:30am Phone #: ###-#### Inspection requested via web by Matt Perry//vapor barrier ok//no bar for slab//specials will test concrete at time of pour///
|
BLD19-00534
| BLD-Concrete | 10/14/2019 | 10/14/2019 | 10/14/2019 2:05:33 PM | P | PASS |
|
|
Concrete pour at 1pm. Inspection on reinforcing steel at edges of corridor Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok pending specials//
|
BLD19-02245
| BLD-Final | 10/14/2019 | 10/14/2019 | 10/14/2019 12:22:47 PM | P | PASS |
|
|
Please call home owner at ###-#### to verify access prior to arrival. Phone #: ###-#### Inspection requested via web by Dustin Collins//final complete//
|
BLD19-02245
| DOC - Permit Finaled | 10/14/2019 | 10/14/2019 | 10/14/2019 12:22:26 PM | P | PASS |
|
|
|
BLD19-00535
| BLD-Concrete | 10/9/2019 | 10/14/2019 | 10/14/2019 11:55:55 AM | A | PART |
|
|
We are pouring the stem walls for Building L (This building at 1pm. Phone #: ###-#### Inspection requested via web by Matt Perry//need to meet bar clearances//specials will be completed//ok when specials pass//
|
BLD19-04098
| BLD-Final | 10/14/2019 | 10/14/2019 | 10/14/2019 11:54:45 AM | P | PASS |
|
|
Inspection requested via web by Ira Rutledge//roof appears to be installed within code requirements//
|
BLD19-04098
| DOC - Permit Finaled | 10/14/2019 | 10/14/2019 | 10/14/2019 11:54:03 AM | P | PASS |
|
|
|
BLD19-03924
| BLD-Footing | 10/11/2019 | 10/14/2019 | 10/14/2019 10:18:27 AM | A | PART |
|
|
Phone #: ###-####//footing depth ok//setbacks were reduced from site plans to 6+ feet--zoning review allows 5 ft side setback--all other setbacks same as siteplan//no posts set at time of inspection//ok to set posts and pour footings//
|
BLD19-02384
| BLD-Framing/Rough-in | 10/11/2019 | 10/14/2019 | 10/14/2019 9:55:39 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//need truss plans and fire blocking at concealed space//ok to insulate only//
|
BLD19-04050
| BLD-Conference | 10/11/2019 | 10/14/2019 | 10/14/2019 9:30:52 AM | A | DONE |
|
|
Scott Phone #: ###-####
|
BLD18-03484
| BLD-Aging Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 8:18:52 AM | | CANC |
|
|
entire project almost complete//
|
BLD19-00239
| BLD-Final | 10/11/2019 | 10/14/2019 | 10/14/2019 8:18:28 AM | A | CANC |
|
|
Drew Phone #: ###-####//cancel per Judith//will reschedule//
|
BLD19-01048
| BLD-Energy code compliance | 10/11/2019 | 10/14/2019 | 10/12/2019 9:34:37 AM | P | CANC |
|
|
Back door is unlocked. Call Eric at ###-#### with questions Phone #: ###-#### >> Inspection requested via web by Eric Mccray Inspection cancelled from web by: Eric Mccray
|