BLD00-01649
| BLD-Framing/Rough-in | 10/12/2001 | 10/15/2001 | 10/16/2001 12:00:00 AM | A | FAIL |
|
|
###-#### complete wires at 2nd fl courtrooms can lites, halls, etc...ok to tile at conf rms only. 10/16/2001 10:54:32 AM
|
BLD01-01478
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
grading permit w/ project..wip 10/15/2001 9:46:52 AM
|
BLD01-00170
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
Cath of Rockies...restrooms...wip. 10/15/2001 9:28:22 AM
|
BLD00-03715
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
called, spoke w/ eng'r & Cloverdale plbg. 10/15/2001 12:00:38 PM
|
BLD00-03212
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
elev to bsmt...volunteer labor...wip 10/15/2001 10:06:41 AM
|
BLD01-01445
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
wip 10/15/2001 12:00:49 PM
|
BLD01-00593
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | PASS |
|
|
roof, no call 10/15/2001 11:59:14 AM
|
BLD01-01277
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
expires 11-10-01 10/15/2001 11:58:01 AM
|
BLD01-02156
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
wip 10/15/2001 10:01:09 AM
|
BLD01-01278
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
no call, expires 11-15-01 10/15/2001 11:32:50 AM
|
BLD01-00628
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | PASS |
|
|
expire now 10/15/2001 10:13:15 AM
|
BLD01-00896
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
left c/n to obtain finals 10/15/2001 11:56:21 AM
|
BLD01-01274
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
expires 11-10-01; roof 10/15/2001 10:08:26 AM
|
BLD01-02191
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
wip 10/15/2001 10:53:16 AM
|
MIS01-00041
| MIS-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | PASS |
|
|
last entry in error...no calls (different project at address caused confusion) 10/15/2001 11:00:23 AM
|
BLD01-01896
| BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
sign...expires 10/15/2001 10:17:35 AM sign...expires 01-02 10/15/2001 10:17:35 AM 10/15/2001 10:18:14 AM
|
MEC01-03040
| Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/15/2001 8:12:48 AM w/ owner...keep c/n
|
BLD01-00808
| BLD-Conference | 10/12/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | CANC |
|
|
###-#### DARRELL
|
BLD00-02242
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 10/15/2001 11:09:54 AM w/ Jason B. re status of permit...keep c/n. Need review of plans for add'l work.
|
BLD01-01445
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 10/15/2001 11:35:44 AM visited site, finish in progress... Dave Schwalbe is contractor.
|
BLD01-00379
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 10/15/2001 10:43:04 AM w/ bldr re req's for fire doors.
|
BLD01-01433
| BLD-Final | 10/14/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/14/2001 at 19:07:51. Contact: ###-####.
|
BLD01-01643
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### re 2nd fl rest rms & floor joist mod, ok per spec/plans 10/15/2001 6:00:46 PM
|
BLD01-00893
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/15/2001 3:11:43 PM w/ bldr...need handrails at 34"-38" above nosing or ramp w/extensions as need
|
BLD01-00917
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/15/2001 3:12:38 PM rec'd engs clarification for bolts at concrete.
|
BLD01-00809
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/15/2001 4:39:30 PM pre-con w/ supt.
|
BLD01-00011
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/15/2001 4:40:27 PM w/ supt...need eng's ok w/ spec insp reports.
|
BLD99-03148
| BLD-Final | 10/12/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 340 On 10/12/2001 3:57:29 PM ###-####
|
BLD01-000-1
| BLD-Framing/Rough-in | 10/12/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
###-#### SCOTT ok to insul sec 2; keep c/n. 10/15/2001 6:06:44 PM
|
BLD01-02028
| BLD-Framing/Rough-in | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
###-####, shaft thru 2nd fl ok; complete firestops at bsmt lid penetrations; need other r/i's for cover. 10/15/2001 3:08:46 PM
|
BLD01-00808
| BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
###-#### darrell, "pre-con" w/ supt. 10/15/2001 4:38:53 PM
|