FIR01-00021
| FIR-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | | NR |
|
|
wip 10/15/2001 7:27:35 AM
|
BLD01-01006
| FIRE-Final Inspection | 10/12/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 14:50:13. Contact: ###-####.
|
BLD01-01661
| FIRE-Final Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 10/15/2001 9:29:13 AM
|
FIR01-00011
| INSP-Sprinkler Rough-in/Hydro | 10/12/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 11:07:36. Contact: ###-####. pre-action hydro okay; all items from previous inspection corrected; areas 1-2 (cafeteria) not completed. 10/15/2001 2:27:11 PM
|
BLD01-02572
| FIRE-Final Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 12:00:00 AM | P | PASS |
|
|
###-#### randy
|