MEC07-03507
| Conference | 10/15/2007 | 10/15/2007 | 10/15/2007 5:29:53 PM | P | PART |
|
|
nicole - please call 1/2 hr prior to inspection Phone #: ###-####...picked up manuf specs for f/p to call the engineering dept and talk to them about the flue terminations..how many can be in one chase and the clearance to any combustibles from caps
|
MEC07-03310
| Pressure Test | 10/12/2007 | 10/15/2007 | 10/15/2007 5:28:03 PM | A | PASS |
|
|
anthony ###-####....first (12) 60lb gas tests in garage ok
|
MEC07-03592
| Pressure Test | 10/15/2007 | 10/15/2007 | 10/15/2007 5:22:32 PM | P | PASS |
|
|
###-####...20lb gas to bbq and f/p ok
|
MEC07-03592
| Final | 10/15/2007 | 10/15/2007 | 10/15/2007 5:21:52 PM | P | NR |
|
|
Pressure test only. Call with any problems. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims..called john about clearance from bbq to overhead combustibles...will need to be checked at final
|
MEC07-03586
| Final | 10/15/2007 | 10/15/2007 | 10/15/2007 5:20:18 PM | P | NR |
|
|
Please inspect as late as possible. Please call with any problems. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims
|
MEC07-03565
| Pressure Test | 10/12/2007 | 10/15/2007 | 10/15/2007 5:19:47 PM | P | PASS |
|
|
Please inspect late afternoon. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims...20lb test from meter to range ok
|
MEC07-03565
| Rough-in | 10/12/2007 | 10/15/2007 | 10/15/2007 5:19:12 PM | P | PASS |
|
|
Please inspect late afternoon. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims...range vent ok
|
MEC07-02608
| Pressure Test | 10/15/2007 | 10/15/2007 | 10/15/2007 3:35:42 PM | P | PASS |
|
|
chase ###-####.....60lb test from meter to both chillers and into the kitchen ok
|
MEC07-01153
| Rough-in | 10/15/2007 | 10/15/2007 | 10/15/2007 2:41:20 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 10/15/2007 at 7:42:35 AM. Contact: ###-####....mark will reschedule for tues am
|
MEC07-02562
| Rough-in | 10/15/2007 | 10/15/2007 | 10/15/2007 2:40:39 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 10/15/2007 at 7:41:15 AM. Contact: ###-####.....mark will reschedule for tues am
|
MEC06-00536
| MEC-Aging Inspection | 10/15/2007 | 10/15/2007 | 10/15/2007 11:59:57 AM | | PASS |
|
|
wip???? building permit still in issue mode
|
MEC07-00046
| MEC-Aging Inspection | 10/15/2007 | 10/15/2007 | 10/15/2007 11:57:13 AM | | PASS |
|
|
wip
|
MEC06-02754
| MEC-Aging Inspection | 10/15/2007 | 10/15/2007 | 10/15/2007 11:56:26 AM | | PASS |
|
|
wip
|
MEC07-03061
| Final | 10/9/2007 | 10/15/2007 | 10/15/2007 11:05:28 AM | P | CANC |
|
|
Please call Ann Johnson at ###-#### prior to for access. Thanks, Andrea. Phone #: ###-#### x0000 Internet Inspection Request from: Andrea Creek Inspection cancelled from web by: Andrea Creek
|
MEC07-02608
| Pressure Test | 10/12/2007 | 10/15/2007 | 10/15/2007 10:08:32 AM | A | NR |
|
|
On site contact is Chase @ ###-####. Job#606. St.John''s Cathedral Phone #: ###-#### Internet Inspection Request from: SUE OGLESBY...i had an inspector meeting this am...i rescheduled this for pm and called chase...thanks dixie
|
MEC03-02084
| Final | 10/15/2007 | 10/15/2007 | 10/15/2007 10:06:47 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 10/15/2007 at 5:25:30 AM. Contact: ###-####..nobody home...i need a contact number
|
MEC07-03541
| Conference | 10/12/2007 | 10/15/2007 | 10/15/2007 10:05:31 AM | A | PASS |
|
|
Buck to Meet with Dixie Fellows at 9:00am at 1504 N. 9th Street, Boise 83702. Phone #: ###-#### Internet Inspection Request from: Sharon Ginter
|