BLD08-00338
| BLD-Final | 10/13/2008 | 10/14/2008 | | A | |
|
|
will Phone #: ###-####
|
BLD08-00941
| BLD-Framing/Rough-in | 10/15/2008 | 10/15/2008 | 10/17/2008 11:32:24 AM | P | PART |
|
|
dave Phone #: ###-#### gas rm not aproved and will need resolved by arch. to meet bld and fire code requirments not addressed on the plan. insulation of the rest of the ti space ok.
|
BLD08-01318
| BLD-Aging Inspection | 10/15/2008 | 10/15/2008 | 10/16/2008 3:46:35 PM | | PASS |
|
|
|
BLD08-01323
| BLD-Aging Inspection | 10/15/2008 | 10/15/2008 | 10/16/2008 3:46:03 PM | | PASS |
|
|
|
BLD08-01428
| BLD-Framing/Rough-in | 10/13/2008 | 10/15/2008 | 10/15/2008 4:23:36 PM | P | PASS |
|
|
thomas Phone #: ###-#### engery code also ok.
|
BLD08-02155
| BLD-Footing | 10/15/2008 | 10/15/2008 | 10/15/2008 2:52:33 PM | P | PASS |
|
|
dave Phone #: ###-####
|
ESC08-00858
| Random Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 2:52:20 PM | P | PART |
|
|
left a message with the RP to install a sediment barrier at the front of the lot due to the slope being over a 2% grade.
|
BLD08-02131
| BLD-Conference | 10/15/2008 | 10/15/2008 | 10/15/2008 2:27:15 PM | P | PASS |
|
|
rick Phone #: ###-#### Note: please cal 1/2 hr prior to inspection
|
BLD08-01771
| BLD-Final | 10/13/2008 | 10/15/2008 | 10/15/2008 1:56:48 PM | P | PASS |
|
|
jessica -call 1st for access Phone #: ###-#### occ ok card at city hall.
|
BLD08-02095
| BLD-Conference | 10/14/2008 | 10/15/2008 | 10/15/2008 10:00:40 AM | A | PASS |
|
|
Blaine Phone #: ###-####
|