FIR08-00039
| INSP-Sprinkler Rough-in/Hydro | 10/14/2008 | 10/15/2008 | 10/16/2008 5:41:43 PM | P | FAIL |
|
|
Need to add coverage at one closet and adjust spacing at one location in the attic-see plans for annotations.
|
FIR07-00899
| INSP-Conference | 10/14/2008 | 10/15/2008 | 10/16/2008 5:39:14 PM | A | DONE |
|
|
On site conference regarding fire sprinkler work at service isle 2421.
|
BLD08-00635
| FIRE-Final Inspection | 10/14/2008 | 10/15/2008 | 10/15/2008 2:55:06 PM | A | PASS |
|
|
Fire life safety passed field inspection for the scope of permit work.
|
FIR08-00694
| INSP-Final Inspection | 10/14/2008 | 10/15/2008 | 10/15/2008 2:15:09 PM | A | PART |
|
|
OH fire sprinkler modifications are approved for cover at the drop ceilings within the tenant remodel area.
|
FIR08-00442
| FIR-Aging Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 1:46:48 PM | | DONE |
|
|
Work in progress, construction underway.
|
BLD08-01771
| FIRE-Final Inspection | 10/13/2008 | 10/15/2008 | 10/15/2008 1:44:32 PM | A | PASS |
|
|
Noted correction items have been completed, life safety finaled.
|
BLD07-00007
| FIRE-Final Inspection | 10/14/2008 | 10/15/2008 | 10/14/2008 4:32:21 PM | A | PART |
|
|
All corrections made per last inspection. Could not final until fire alarm permit is finaled. KR
|