ESC09-00599
| Conference | 10/15/2009 | 10/15/2009 | 10/15/2009 1:54:10 PM | P | DONE |
|
|
Met with RP's rep and inspector 460 on site. Agreed that site need a sediment barrier (recommended silt fence) between the stockpile soils and the water drainage. Other controls as outlined by inspector also are needed. Contact person stated that whatever is needed will be implemented.
|
ESC09-00352
| Conference | 10/15/2009 | 10/15/2009 | 10/15/2009 10:09:28 AM | P | CANC |
|
|
Training exercise
|
FIR09-00347
| INSP-Sprinkler Rough-in/Hydro | 10/14/2009 | 10/15/2009 | 10/15/2009 10:09:11 AM | A | CANC |
|
|
jake - underground hydro Phone #: ###-####
|