ESC08-00585
| General Inspection | 10/15/2009 | 10/15/2009 | 10/15/2009 3:49:57 PM | | PASS |
|
|
no activity.
|
ESC09-00507
| BMP Violation | 10/14/2009 | 10/15/2009 | 10/15/2009 3:49:29 PM | P | CANC |
|
|
moved till 10/16/09am.
|
ESC09-00644
| Site Preparation | 10/14/2009 | 10/15/2009 | 10/15/2009 3:47:00 PM | P | PART |
|
|
Verbal message to RP: Clean up all sediment and debris on a daily basis off of the street and sidewalk. NO other issues
|
ESC09-00599
| Conference | 10/15/2009 | 10/15/2009 | 10/15/2009 2:11:30 PM | P | DONE |
|
|
Went over with Dustin the rep of the RP since he is out of town. Went over the area that is needed for sediment protection. Will re-inspect on 10/19/09 AM.
|
ESC09-00021
| Tracking Control | 10/15/2009 | 10/15/2009 | 10/15/2009 2:10:07 PM | A | FAIL |
|
|
Verbal message to RP: Clean all track out off of the project area. Maintain construction entrance.
Spoke with the SUper of the job (Dale) and was told that at the end of the day of if it gets excessive he will have a sweepr come by. Also no one will be parking on the project as of tomorrow. Will re-inspect on 10/19/09 AM.
|
ESC09-00563
| Site Preparation | 10/13/2009 | 10/15/2009 | 10/15/2009 10:25:44 AM | A | PASS |
|
|
|
ESC09-00599
| Site Preparation ESC | 10/15/2009 | 10/15/2009 | 10/15/2009 9:45:20 AM | | FAIL |
|
|
Verbal correction to RP: (RP is out of town till Monday the 19th of Oct.) 1. Install a sediemnt barrier along the west end of project for additional protection for the canal. 2. Post the ESC sign at front of drive to be visable from the road. 3. Recommend a stabilized construction exit. Will require it if any exccessive tracking occurs. Will re-inspect on 10/19/09AM.
|
ESC09-00626
| Site Preparation | 10/15/2009 | 10/15/2009 | 10/15/2009 9:04:29 AM | | NR |
|
|
|