Inspections for the day of: Friday, October 15, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-02303 FIRE-Final Inspection10/15/201010/15/201010/15/2010 2:08:41 PMPPASS
Life safety passed.
FIR10-00428 INSP-Final Inspection10/15/201010/15/201010/15/2010 2:06:15 PMPFAIL
The smoke detectors tested ok. Plan modifications are needed since a hat/light does light up in the elevator car. Also no shunt trip or heat detector has been provided as shown on the plans. This is due to no sprinkler being located in the machine room. Also there are now a total of three smoke detectors installed due to beam pockets.
FIR10-00429 INSP-Final Inspection10/15/201010/15/201010/15/2010 1:57:35 PMPFAIL
No test was performed at this location. Plan modifications are needed since a hat/light does light up in the elevator car. Also no shunt trip has been provided for the heat detector to activate. There are also sprinkler heads at the top and bottom of the elevator shaft.
BLD10-02422 FIRE-Final Inspection10/14/201010/15/201010/15/2010 1:55:07 PMPFAIL
See the city approved plans for the deficiencies listed
FIR10-00238 INSP-Final Inspection10/15/201010/15/201010/15/2010 1:51:46 PMPFAIL
Will be able to final when the insulation is repaired throughout the warehouse.
BLD10-02227 FIRE-Conference10/14/201010/15/201010/15/2010 12:38:19 PMADONE
I went over emergency light/exit sign placement with Todd and Kevin.
BLD10-01386 FIRE-Final Inspection10/14/201010/15/201010/15/2010 10:43:53 AMAPASS
Life safety passed. The manual flush bolts to three tanning rooms were removed while I waited and the non-approved hardware was removed to the mechanical room. The owner was going to provide the correct hardware prior to the building inspection.
FIR10-00072 INSP-Sprinkler Rough-in10/14/201010/15/201010/15/2010 10:40:51 AMAPASS
The underground supply piping is ok to cover.
FIR10-00492 INSP-Final Inspection10/14/201010/15/201010/15/2010 9:31:48 AMAPASS
Permit finaled
FIR10-00242 INSP-Final Inspection10/14/201010/15/201010/15/2010 9:28:41 AMAPASS
Permit finaled