BLD13-02109
| FIRE-Final Inspection | 10/15/2013 | 10/15/2013 | 10/16/2013 5:13:47 PM | P | PASS |
|
|
Fire life safety inspection passed. *Note- no signature card available on site.
|
FIR13-00490
| INSP-Final Inspection | 10/15/2013 | 10/15/2013 | 10/16/2013 5:12:10 PM | P | PASS |
|
|
Fire sprinkler work passed final walkthrough.
|
FIR13-00332
| INSP-Final Inspection | 10/15/2013 | 10/15/2013 | 10/16/2013 5:10:41 PM | P | PASS |
|
|
Fire sprinkler permit work approved for final.
|
BLD13-02305
| FIRE-Final Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 1:13:35 PM | P | PASS |
|
|
Fire life safety okay pending EM lights and one exit sign are repaired or provided per plan as discussed. MIssing door/frame and glass to be completed prior to structural final.
|
FIR13-00554
| INSP-Sprinkler Rough-in | 10/14/2013 | 10/15/2013 | 10/15/2013 1:10:36 PM | A | PART |
|
|
Okay to cover overhead work at the new office grid ceiling.
|
BLD13-02833
| FIRE-Final Inspection | 10/14/2013 | 10/15/2013 | 10/15/2013 1:09:24 PM | A | PASS |
|
|
Previous correction items verified for completion. Fire life safety inspection passed.
|