ESC12-00852
| Aging Inspection | 10/15/2013 | 10/15/2013 | 10/16/2013 11:01:45 AM | | PASS |
|
|
Finaled.
|
ESC13-00369
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 4:51:02 PM | | PASS |
|
|
WIP; no ESC violations at time of inspection.
|
ESC12-00967
| Aging Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 4:35:32 PM | | PASS |
|
|
Finaled. See activity notes.
|
ESC12-00967
| DOC - Permit Finaled | 10/15/2013 | 10/15/2013 | 10/15/2013 4:34:42 PM | P | PASS |
|
|
Construction complete. All other permits finaled. ESC requirements have been fulfilled.
|
ESC13-00013
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 4:17:44 PM | | PASS |
|
|
Permit posted. No ESC violations at time of inspection. Approved. WIP
|
ESC13-00279
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 3:38:49 PM | | PART |
|
|
Pre-fab building has already been installed. Evidence of uncontained cement washout; wattle still in place. BLD permit is still open. Need to clean up cement and remove wattle. Left written correction notice.
|
ESC13-00817
| General Inspection | 10/14/2013 | 10/15/2013 | 10/15/2013 3:14:42 PM | A | FAIL |
|
|
Track out onto street originates from construction site. Drop inlet protection on MS4 down the street is full and should be replaced. Called RP to give verbal correction notice.
|
ESC12-00932
| Aging Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 2:48:56 PM | | PASS |
|
|
wip. Will need to move stockpile once finished, but at this time no ESC violations or track out.
|
ESC13-00401
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 2:40:21 PM | | PASS |
|
|
|
ESC13-00363
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 1:53:59 PM | | PASS |
|
|
Using adjacent lot for staging, so will need to be stabilized upon completion. BMPs in place, no ESC violations at time of inspection.
|
ESC13-00004
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 10:04:25 AM | | PASS |
|
|
Finaled. See activity notes.
|
ESC13-00004
| DOC - Permit Finaled | 10/15/2013 | 10/15/2013 | 10/15/2013 10:02:47 AM | P | PASS |
|
|
Building project for Salon Eden is complete, now building is empty again. No activity. Any new work will need new permits.
|
ESC12-00725
| Aging Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 9:58:41 AM | | PASS |
|
|
No construction activity.
|
ESC13-00044
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 9:47:40 AM | | PASS |
|
|
No activity at time of inspection. Project is reportedly in the works but has been on hold for some time. No ESC violations observed.
|
ESC12-00555
| Aging Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 9:20:48 AM | | PASS |
|
|
No activity. Can be finaled when BLD permit is finaled or at next general inspection. ESC permit issued June 2012.
|
ESC12-01147
| General Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 9:06:26 AM | | PASS |
|
|
Permit posted on job sign. No track out or other ESC violations. On-site drop inlet protected with filter bags. Discussed removal of BMPs when finished with RP Ryan Smith who was on-site. Plan to open on the Oct. 28th, but have other permits open.
|