FIR14-00344
| INSP-Sprinkler Rough-in | 10/14/2014 | 10/15/2014 | 10/16/2014 5:29:34 PM | P | PART |
|
|
Rough-in at 2nd floor building B completed. Items noted include; min spacing at unit C208, unfinished 2" main to mechanical room, obstructed sprinkler coverage at unit C202, fire blocking incompleted at some locations. Housekeeping, trash, mechanical rooms not yet finished.
|
FIR14-00394
| INSP-Final Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 3:38:02 PM | P | PASS |
|
|
Fire alarm permit work passed inspection. Permit finaled.
|
BLD14-02967
| FIRE-Final Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 2:21:10 PM | P | PASS |
|
|
Fire life safety passed provided tenant removes curtains at the non-required second exit or removes exit signage at this location. To be finished prior to structural final for verification at that time.
|
FIR14-00612
| INSP-Sprinkler Rough-in | 10/14/2014 | 10/15/2014 | 10/15/2014 11:51:19 AM | A | PART |
|
|
Rough-in inspections completed for the following areas; multipurpose gym, main only at the riser room thru to the north addition hallway, new multipurpose room 202, conference room 119, food bank 114. Verified corrections at the sanctuary mezzanine. Refer to plans for dated annotations.
|
BLD14-00920
| FIRE-Final Inspection | 10/14/2014 | 10/15/2014 | 10/15/2014 10:30:02 AM | A | PASS |
|
|
Fire life safety inspection okay for final pending directional arrows as discussed at two exit signs, remove keyed locking hardware at the conference room door. Items to be finished prior to structural final as agreed. Inspection passed.
|
FIR14-00385
| INSP-Final Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 10:27:35 AM | A | PASS |
|
|
Scope of fire sprinkler work passed final walkthrough and inspection. Permit finaled.
|
FIR14-00639
| INSP-Sprinkler Rough-in | 10/14/2014 | 10/15/2014 | 10/15/2014 10:25:46 AM | A | PART |
|
|
Fire sprinkler work at the grid ceilings in perimeter rooms as marked and dated on stamped plans approved for cover.
|