ESC15-00339
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 4:37:21 PM | P | PASS |
|
|
|
ESC15-01001
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 4:00:39 PM | P | PASS |
|
|
WIP. Trackout is minimal with the stabilized entrance with St. Als being swept. Sediment controls installed on drainage swale, no fugitive dust issues observed. No corrections
|
ESC14-00588
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 3:22:22 PM | | PASS |
|
|
No significant trackout from site, water trucks circling periodically on roads for dust control within site.
Irrigation water is no longer running through site and discharging to Boise River channel. Groundwatering is complete as well.
RP stated entry roads are to be paved next week and he will provide a stabilzed parking area for workers to prevent trackout and creation of puddles in parking lots. Concrete washouts are being utilized.
Approved.
|
ESC15-00971
| BMP Violation | 10/14/2015 | 10/15/2015 | 10/15/2015 2:43:33 PM | P | FAIL |
|
|
No new DI bag installed at Woodland and Dalton (south side of street). TKO site still has significant amount of loose sediment in front of home.
Final warning before inspection fees and/or SWO to TJ with TKO
|
ESC15-00468
| General Inspection | 10/6/2015 | 10/15/2015 | 10/15/2015 2:06:07 PM | P | PASS |
|
|
Follow up with RP-GC on post excavation phase of BMP installation
Silt fence installed at bottom of slope and trenched in. Wattles protecting stockpile along sidewalk. Permit sign posted. No trackout or sediment leaving site. Approved. No further debris on golf course area below site
|
ESC15-00350
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 1:24:52 PM | | PASS |
|
|
ACHD downtown road improvements staging yard is still in use. No trackout from access points, no windblown dust, and gutters around site are free of loose sediment or discharges. Approved.
|
ESC15-01220
| Site Preparation | 10/14/2015 | 10/15/2015 | 10/15/2015 12:41:16 PM | A | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted at site. Active work by Tahoe in compliance. Subdivision BMPs installed. Approved for excavation.
|
ESC15-00403
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 12:04:00 PM | | FAIL |
|
|
###-#### Rob...
No activity at time of inspection. Warning issued to Hard Rock in regards to not scheduling site prep. Perimeter sediment BMPs and sign are posted. Rain4rent tank on site.
Notified that PW sewer inspector shut the operation down due to dewatering failure.
Dewatering permit pulled with ACHD to discharge "visibly clean and clear water" into MS4 swales.
|
ESC13-01279
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 11:17:01 AM | | PASS |
|
|
WIP on homes in Harris Crossing. No sedment leaving site at perimeters. No trackout to streets, DIs protected and designated washouts being utilized. No fugitive ust observed. Approved.
|
ESC15-00556
| General Inspection | 10/14/2015 | 10/15/2015 | 10/15/2015 11:15:42 AM | P | FAIL |
|
|
No response from RP- developer in regards to Correction Requests (Tuesday - me, Evan - today) to schedule dust suppression application and/or hydroseed with tacifier. Area is dusty from traffic and windblown dust.
Additional controls:
1. No further equipment parking in the area of concern on HV Road.
2. Install fencing to control access to area (turn arounds, cement trucks, lost drives). Block access within subdivision on the unfinished portions. Note - issued request to Tahoe Homes to direct concrete truck and subcontractors not to use these roads.
3. Water truck to be onsite for all construction activity and further grading. No activity at site at time of inspection.
Written CN posted....
|
ESC15-00221
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 10:21:53 AM | | PASS |
|
|
SFH in progress. North hillside has remained undisturbed and is vegetation. Grade of lot is below Hillcrest street, minimal trackout occuring. No corrections issued.
|
ESC14-00462
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 9:45:07 AM | | PASS |
|
|
WIP on pool in backyard. Area below pool is retaining wall. Home is occupied, no trackout or erosion issues occuring.
|
ESC15-00467
| Aging Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 9:20:04 AM | | PASS |
|
|
Home near completion. Interior finish work and landscaping in progress. No discharges from site, no violations
|
ESC15-00412
| General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 8:39:28 AM | | PASS |
|
|
WIP at south end of site. Greenhouse located within gated compound. No trackout at access points, no fugitive dust.
|
ESC15-00234
| General Inspection | 10/6/2015 | 10/15/2015 | 10/14/2015 1:53:45 PM | A | CANC |
|
|
data entry error
|