ELE18-03948
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 3:52:42 PM | P | PASS |
|
|
CALL PRIOR TO ARRIVING IT IS LOCKED. Phone #: ###-#### Inspection requested via web by Hidajet Zahic Final ok
|
ELE18-03948
| Final | 10/15/2018 | 10/15/2018 | 10/15/2018 3:31:18 PM | P | PASS |
|
|
CALL PRIOR TO ARRIVING IT IS LOCKED. Phone #: ###-#### Inspection requested via web by Hidajet Zahic Final ok
|
ELE18-03948
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 3:27:28 PM | P | PASS |
|
|
CALL PRIOR TO ARRIVING IT IS LOCKED. Phone #: ###-#### Inspection requested via web by Hidajet Zahic Only addition to location is an oven, All electrical in existing kitchen area original to previous tenant. All receptacles that appear newer are GFCI protected. Contractor removed a microwave and extension cord kitchen area to avoid code issue. Oven rough in ok
|
ELE18-03952
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 3:22:22 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jose Guerrero 210.52- No point measured a long floor line shall be more than 6' from a receptacle outlet. In nook first receptacle outlet more than 8' from end of cabinet. receptacles serving counter top areas do not count for general layout. 334.30- NM cable shall have supports not to exceed 4 1/2'. 14-2 to can over stairs hangs below truss with supports over 4 1/2'. 800.100(B)(2)- Single family dwelling units with grounded electrical systems shall have gounding conductors connected to grounding electrode system.
|
ELE18-03753
| Rough-In Permanent Service | 10/14/2018 | 10/15/2018 | 10/15/2018 2:15:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ERIC CENTERS Raceway installed for future solar all labeled every 10' with junction in garage soffit. Rough in ok cover p/s u/g n ok
|
ELE18-03920
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 1:44:30 PM | P | PASS |
|
|
oops will be there around noon an make sure you have access Phone #: ###-#### Inspection requested via web by dennis mcneely Level 2 floor rough in ok cover
|
ELE18-02479
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 1:28:00 PM | P | PASS |
|
|
Ceiling rough in inspection for level 12 CH2M at the One Capitol building Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 12 office grid rough ok cover
|
ELE18-03533
| Final | 10/14/2018 | 10/15/2018 | 10/15/2018 12:47:52 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman Final ok
|
ELE18-03934
| Permanent Service | 10/14/2018 | 10/15/2018 | 10/15/2018 12:32:59 PM | A | PASS |
|
|
We Had To Move Service To New pole As Per Idaho Power New Pole Requirements And Powered New Modular Or Mobile Home.The Trailer Is Open And All Ready For Inspection Thanks Dave ###-#### Phone #: ###-#### Inspection requested via web by jason shifflett Underground rough in ok cover p/s o/h n ok
|
ELE17-02862
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 12:15:54 PM | A | PASS |
|
|
Garage ceiling for insulation Phone #: ###-#### Inspection requested via web by Tom Betty NEC 330.30 and 110.27- MC cable shall not be installed where subject to physical damage. Just outside meter area is a lower section of ceiling where MC located between 6'6" and 7'. If located below striker height this area shall be protected from damage from traffic and pedestrian traffic by fencing off. Area of ceiling in parking garage ok to insulate.
|
ELE18-01588
| Final | 10/14/2018 | 10/15/2018 | 10/15/2018 10:21:33 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer 408.4- Circuit directory shall be complete. 410.16- Master closet flourescent shall clear storage shelf by 6" minimum.
|
ELE18-01590
| Final | 10/14/2018 | 10/15/2018 | 10/15/2018 10:20:14 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer 406.6- Up bathroom receptacle cover not installed due to tile blocks installation.
|
ELE18-03936
| Rough-In Permanent Service | 10/14/2018 | 10/15/2018 | 10/15/2018 9:48:47 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Heideman 250.32(A)- Seperate buildings fed by feeders or branch circuits shall have a grounding electrode system installed. 250.68- Connections to grounding electrode system shall be accessible after drywall installed. Mudring. 250.94- Provisions shall be provided for a intersystem bond connected to a grounding electrode system. 300.4- nail plates needed in up east bedroom. 300.15- wiring for disposal shall terminate in a box. wires not in box.
|
ELE18-03935
| Rough-In Permanent Service | 10/14/2018 | 10/15/2018 | 10/15/2018 9:44:43 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Heideman 250.32(A)- A seperate building or structure fed by feeders or branch circuits shall have a grounding electrode system installed. 250.68- Connection to grounding electrode sysem shall be accessible after drywall installed. Mudring. 250.94- Provisions shall be provided for a intersystem bond that shall connect to a grounding electode system. 300.4- nail plates needed under stair near switch.
|