ELE18-03738
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 3:44:36 PM | P | CANC |
|
|
Nothing to look at at thias time
|
ELE18-03944
| Permanent Service | 10/15/2018 | 10/15/2018 | 10/15/2018 1:43:44 PM | P | PASS |
|
|
Please arrive by 2pm if at all possible so we can get Idaho Power back out to reconnect. Thanks! Phone #: ###-#### Inspection requested via web by Same Electric p/s o/h rec ok
|
ELE18-03659
| Final | 10/12/2018 | 10/15/2018 | 10/15/2018 1:42:28 PM | P | PASS |
|
|
This is ready to final off. Joe Kaminsky is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
|
ELE18-03924
| Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 1:41:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz Kitchen only ok to cover
|
ELE18-03931
| Temporary Service | 10/12/2018 | 10/15/2018 | 10/15/2018 1:40:51 PM | A | PASS |
|
|
This is overhead. If you have any questions please feel free to contact Darren ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan
t/s o/h n ok
|
ELE18-03865
| Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 12:43:18 PM | A | PASS |
|
|
Taylor Barton " ###-####" Phone #: ###-#### Inspection requested via web by BRS PermittingVerified listing and scope of work on Solar Array install also did a conference on line side tap, If a disc of power is needed to perform tap the service will need to be redone to current code due to it not up to code ......
|
ELE18-03929
| Conference | 10/12/2018 | 10/15/2018 | 10/15/2018 12:39:01 PM | A | DONE |
|
|
please call 1 hour before you go out so that i can meet you Phone #: ###-#### Inspection requested via web by Chris Berthelot Discussed re-wiring whole house due to several open spices and j-boxes located behind sheetrock, contractor will re-wire as the liability is to high due to there could still be multiple areas with same issue.
|
ELE18-01179
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 12:21:21 PM | P | PASS |
|
|
part roughin- Greg Phone #: ###-#### Back of house master,living, bath all ok to cover
|
ELE18-03930
| Final | 10/12/2018 | 10/15/2018 | 10/15/2018 9:59:35 AM | A | PASS |
|
|
It will be open. If you have any questions please feel free to contact Clay ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan As per Rock Hudson final ok Upstairs is for storage aat this time
|
ELE18-03938
| Electrical Rough-In | 10/14/2018 | 10/15/2018 | 10/15/2018 9:47:10 AM | A | PASS |
|
|
Ground works inspection Phone #: ###-#### Inspection requested via web by Don Conley u/g to detached garage ok to cover
|
ELE18-03738
| Permanent Service | 10/11/2018 | 10/15/2018 | 10/15/2018 9:42:55 AM | A | CANC |
|
|
Aaron Phone #: ###-####
|
ELE18-03797
| Electrical Rough-In | 10/13/2018 | 10/15/2018 | 10/15/2018 9:42:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks Whole house rough-in ok to cover
|
ELE18-03797
| Permanent Service | 10/15/2018 | 10/15/2018 | 10/15/2018 9:41:31 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks p/s o/h rec ok
|
ELE18-03922
| Temporary Service | 10/12/2018 | 10/15/2018 | 10/15/2018 9:02:40 AM | A | PASS |
|
|
Jeff Phone #: ###-#### t/s u/g n ok
|
ELE18-03923
| Temporary Service | 10/12/2018 | 10/15/2018 | 10/15/2018 9:02:19 AM | A | PASS |
|
|
Jeff Phone #: ###-#### t/s u/g n ok
|