ELE19-02329
| Final | 10/15/2019 | 10/15/2019 | 10/15/2019 3:09:18 PM | P | PASS |
|
|
Doors will be unlocked any questions please give me a call thank you Phone #: ###-#### Inspection requested via web by David Kubik Ok final.
|
ELE19-03670
| Electrical Rough-In | 10/15/2019 | 10/15/2019 | 10/15/2019 1:57:00 PM | P | PASS |
|
|
This is for the underground. If you have any questions please feel free to contact Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover. Minimum depth 24"
|
ELE19-03972
| Electrical Rough-In | 10/15/2019 | 10/15/2019 | 10/15/2019 1:08:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover.
|
ELE19-03972
| Permanent Service | 10/15/2019 | 10/15/2019 | 10/15/2019 1:08:04 PM | P | PASS |
|
|
p/s u/g n ok
|
ELE19-02335
| Temporary Service | 10/14/2019 | 10/15/2019 | 10/15/2019 12:50:08 PM | P | CANC |
|
|
Idaho Power was called to shut down power today however I received no confirmation. Power Shut Down is required for Service Upgrade. This inspection is for Re-Energize inspection after Power is restored. If any questions, please call Brad (Foreman) @ ###-#### one hr prior to arrival. Thank you. Inspection requested via web by Rob Maes Talked to Preston, IDP could not make it out for todays disconnect
|
ELE19-03153
| Electrical Rough-In | 10/14/2019 | 10/15/2019 | 10/15/2019 11:53:47 AM | P | PASS |
|
|
floor heat inspection at master bedroom and bathroom. Call for access or to meet on site Phone #: ###-#### Inspection requested via web by steve sellers Ok cover floor heat mstr bed/bath. No furniture is permanently attached.
|
ELE19-03963
| Electrical Rough-In | 10/14/2019 | 10/15/2019 | 10/15/2019 11:52:09 AM | A | PASS |
|
|
Contact: Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 3rd floor switch that was moved from 1 side to the other in office.
|
ELE19-03962
| Temporary Service | 10/15/2019 | 10/15/2019 | 10/15/2019 11:33:46 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Cevyn Recla t/s o/h n ok
|
ELE19-03607
| Electrical Rough-In | 10/14/2019 | 10/15/2019 | 10/15/2019 11:19:43 AM | A | PASS |
|
|
For access please call Jaman 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Ok cover kitch, up bath, down bed/bath and garage.
|
ELE19-00560
| Final | 10/15/2019 | 10/15/2019 | 10/15/2019 10:03:13 AM | A | PART |
|
|
Please contact when in route. Final is for second floor only. Phone #: ###-#### Inspection requested via web by Cortney Hopper Partial final for 2nd floor. Electrician let the General and occupants know that move in was not supposed to happen prior to electrical inspection. Asked contractor to let general and occupants know that 1st floor will be free of all furniture or inspection will not be done until things are moved.
|
ELE19-03708
| Final | 10/14/2019 | 10/15/2019 | 10/15/2019 9:08:06 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kilee Russell Ok final. Labels present, 40a brkr.
|
ELE19-03708
| Electrical Rough-In | 10/14/2019 | 10/15/2019 | 10/15/2019 9:07:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kilee Russell Items UL listed, matches paperwork. Ok cover.
|
ELE19-02362
| Temporary Service | 10/14/2019 | 10/15/2019 | 10/15/2019 8:56:33 AM | A | CANC |
|
|
Back corner of lot. Overhead temp. There is alley access Phone #: ###-#### Inspection requested via web by Cevyn Recla Talked to Cevyn, wrong permit called in.
|
ELE17-01305
| ELE-Aging Inspection | 10/15/2019 | 10/15/2019 | 10/15/2019 5:55:57 AM | | DONE |
|
|
Please schedule a final inspection
|
ELE17-01321
| ELE-Aging Inspection | 10/15/2019 | 10/15/2019 | 10/15/2019 5:55:17 AM | | FAIL |
|
|
Schedule a final inspection.
|
ELE17-01330
| ELE-Aging Inspection | 10/15/2019 | 10/15/2019 | 10/15/2019 5:30:28 AM | | DONE |
|
|
Please coordinate and schedule a final inspection
|