PLM95-00807
| INSP - Sewer line | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - ran into existing bld 17 sewer, broke hammer, no additional
|
PLM95-00807
| INSP - Sewer line | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - ran into existing bld 17 sewer, broke hammer, no additional
|
PLM95-00807
| INSP - Sewer line | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - plus 20', backfill, rocks,rocks,rocks!
|
PLM95-01002
| INSP - Final | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | NR |
|
|
/ / 330 -
|
PLM95-01002
| INSP - Final | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | NR |
|
|
/ / 330 -
|
PLM95-01286
| INSP - Sprinkler & Backflow | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - corrections: two unions required, roll testports up, ok to c reinspectionrequired
|
PLM95-01318
| INSP - Water lines | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - water line ok with foundation pen. sealed, no sewer or it ha left notice.
|
PLM95-01318
| INSP - Water lines | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PART |
|
|
/ / 330 - water line ok with foundation pen. sealed, no sewer or it ha left notice.
|
PLM95-01322
| INSP - Sprinkler & Backflow | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PASS |
|
|
/ / 330 -
|
PLM95-01322
| INSP - Sprinkler & Backflow | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | PASS |
|
|
/ / 330 -
|
PLM4045583
| INSP - Sewer line | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | FAIL |
|
|
/ / 330 - reexcavate stub and bed inclean fill, 90 degree offsets are two 45 degree elbows,
|
PLM4045583
| INSP - Sewer line | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | | FAIL |
|
|
/ / 330 - reexcavate stub and bed inclean fill, 90 degree offsets are two 45 degree elbows,
|
PLM95-00723
| INSP - Sewer and Water lines | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | P | PART |
|
|
10/16/95 330 -
|
PLM95-00825
| INSP - Plumbing Rough-in | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | P | PASS |
|
|
10/16/95 330 - 9 FIXTURES 3-wc,4-lav,2-tub,2-sh,1-si,1-wb,1-wh
|
PLM95-00914
| INSP - Final | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | P | PASS |
|
|
10/16/95 330 -
|
PLM95-00954
| INSP - Final | 10/16/1995 | 10/16/1995 | 10/16/1995 12:00:00 AM | P | PASS |
|
|
10/16/95 330 - IM NOT SURE IF YOU FINALED THIS ONE OR NOT NOTHING IN THE COMPUTER AS OF YET, ONLY STATES IT WAS TRANSMITTED TO YOU ON 10/12/95.MPM this was finaled on 10/12/95
|