Inspections for the day of: Thursday, October 16, 1997.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-02683 INSP - Conference10/16/199710/16/199710/16/1997 12:00:00 AM PASS
/ / 350 - went over duct work in basement with contractor
MEC97-02901 INSP - Rough-in & Gas Pressure10/16/199710/16/199710/16/1997 12:00:00 AM FAIL
/ / 350 - r/i, pt both failed, corrections posted
BLD97-00408 INSP - Letter of compliance10/16/199710/16/199710/16/1997 12:00:00 AM PASS
/ / 350 - c/c #12051
BLD97-00408 INSP - Letter of compliance10/16/199710/16/199710/16/1997 12:00:00 AM PASS
/ / 350 - c/c #12051
BLD97-00408 INSP - Final10/15/199710/16/199710/16/1997 12:00:00 AMAPASS
10/16/97 350 - final
BLD96-02800 INSP - Foundation10/15/199710/16/199710/16/1997 12:00:00 AMACANC
10/16/97 350 - REPORT FOR MIKELSON MASONARY FOR 10/15/97 7 YDS to be done by #340
MEC97-02483 INSP - Rough-in & Gas Pressure10/15/199710/16/199710/16/1997 12:00:00 AMAPART
10/16/97 350 - Scheduled by Hello! on 10/15/97 at 12:48:57. partial r/i, not finished, no pt gage was pegged out
MEC97-02842 INSP - Gas pressure test10/15/199710/16/199710/16/1997 12:00:00 AMAPASS
10/16/97 350 - pt ok, final
MEC97-02888 INSP - Final10/15/199710/16/199710/16/1997 12:00:00 AMAFAIL
10/16/97 350 - BISHOP KELLY/ ALSO NEEDS PT pt ok, but need shut-off outside building for gas line shut-off to build
MEC97-02888 INSP - Final10/15/199710/16/199710/16/1997 12:00:00 AMAFAIL
10/16/97 350 - BISHOP KELLY/ ALSO NEEDS PT pt ok, but need shut-off outside building for gas line shut-off to build
MEC97-02898 INSP - Gas log/ Fireplace10/15/199710/16/199710/16/1997 12:00:00 AMAPASS
10/16/97 350 - f/p ok, final
MEC97-02899 INSP - Gas log/ Fireplace10/15/199710/16/199710/16/1997 12:00:00 AMACANC
10/16/97 350 - to be done by #407
MEC97-02560 INSP - Final10/15/199710/16/199710/16/1997 12:00:00 AMPPASS
10/16/97 350 - rein final
MEC97-02560 INSP - Final10/15/199710/16/199710/16/1997 12:00:00 AMPPASS
10/16/97 350 - rein final
MEC97-02683 INSP - Framing/ Rough-in10/16/199710/16/199710/16/1997 12:00:00 AMPPASS
10/16/97 350 - Scheduled by Hello! on 10/16/97 at 06:43:59. r/i ok finally
MEC97-02905 INSP - Rough-in & Gas Pressure10/15/199710/16/199710/16/1997 12:00:00 AMPPASS
10/16/97 350 - r/i ok, pt ok, check for comb. air on final
MEC97-02909 INSP - Rough-in & Gas Pressure10/16/199710/16/199710/16/1997 12:00:00 AMPPASS
10/16/97 350 - r/i ok, pt ok