ELE00-03989
| Electrical Rough-In | 10/13/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | PASS |
|
|
###-#### . inspection was ele r/i and final jointly. 10/16/2000 11:45:42 AM
|
ELE00-03768
| Final | 10/13/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | CANC |
|
|
###-####. inspection request was intended for ele r/i; kitchen area. 10/16/2000 11:47:38 AM
|
ELE00-03989
| Final | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 403 On 10/16/2000 completed.
|
ELE00-03768
| Electrical Rough-In | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 403 On 10/16/2000 upstairs kitchen area raceways.
|
ELE00-00271
| Final | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | FAIL |
|
|
###-####. nec: 680-41(d). all metal within 5ft. of spa shall be bonded. Posted; called contractor. 10/16/2000 9:19:28 PM
|
ELE00-03995
| Permanent Service | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PART |
|
|
wayde 250- 1101. changed service to duplex meter/main. 10/16/2000 9:20:33 PM
|
ELE00-02950
| Electrical Rough-In | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PART |
|
|
bedroom Casile ###-####. conference, branch circuit installation; 1-room remodel. 10/16/2000 9:18:03 PM
|
ELE00-03537
| Electrical Rough-In | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PART |
|
|
4th floor harry ###-####. walls ele r/i. 10/16/2000 9:16:55 PM
|