MEC00-01895
| Final | 10/13/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 15:28:20. Contact: ###-####.3 doors all locked. 10/16/2000 9:59:31 AM
|
MEC00-02030
| Final | 10/13/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 15:51:53. Contact: ###-####.This must have been a mistake this job was finaled on 8/18/00. 10/16/2000 12:58:01 PM 10/16/2000 12:58:20 PM
|
BLD00-01978
| BLD-Final | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 07:24:16. Contact: ###-####.
|
BLD00-01362
| BLD-Final | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 07:25:52. Contact: ###-####.
|
MEC00-03489
| Rough-in | 10/12/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/12/2000 at 15:06:59. Contact: ###-####.gas test ok r-i not ready left c/n. 10/16/2000 10:49:03 AM
|
BLD99-01126
| BLD-Final | 10/13/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | A | PASS |
|
|
Marv Meyer, ###-#### - I have the card on my desk - Cathy
|
BLD00-02509
| BLD-Energy code compliance | 10/13/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PASS |
|
|
tom ###-####
|
MEC00-03433
| Rough-in | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 08:23:32. Contact: ###-####.Previous c/n 2" at top of vent pipe has be gained by lowering pie and now does not have 1/4" per foot rise new c/n posted. 10/16/2000 2:16:05 PM
|
BLD00-01879
| BLD-Energy code compliance | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 09:08:47. Contact: ###-####.c/n posted. 10/16/2000 3:49:27 PM
|
MEC00-02595
| Final | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 09:22:46. Contact: ###-####.
|
MEC00-02923
| Final | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 09:26:35. Contact: ###-####.
|
MEC00-03280
| Rough-in | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 09:43:40. Contact: ###-####.c/n dryer vent. 10/16/2000 3:16:00 PM
|
BLD00-02340
| BLD-Foundation | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PART |
|
|
foundation wall Mana ###-####appears ok no plans. 10/16/2000 1:43:55 PM
|
BLD00-02339
| BLD-Foundation | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PART |
|
|
mana ###-####appears ok no plans. 10/16/2000 1:46:24 PM
|
MEC00-03338
| Pressure Test | 10/16/2000 | 10/16/2000 | 10/16/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 407 On 10/16/2000
|
MEC00-02203
| Final | 10/13/2000 | 10/16/2000 | 10/13/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 11:50:46. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/13/2000 at 15:25:49.
|