PLM01-02352
| PLM-Aging Inspection | 10/16/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | | PASS |
|
|
this project was done at the same time as 1608 sunrise rim and run down a common trench on the property line, and finaled at the same time. 10/16/2001 8:00:40 AM
|
PLM01-03518
| Water and/or Sewer | 10/15/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | A | PASS |
|
|
|
PLM01-01601
| Final | 10/15/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | A | PASS |
|
|
fn greg ###-#### gar door entry code is 5575 final ok with dw hose secured, and pedistal lav calked 10/16/2001 10:25:17 AM
|
PLM01-03543
| Water and/or Sewer | 10/15/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | A | PASS |
|
|
swr & water- ###-#### - huck
|
PLM01-03527
| Plumbing Rough-in | 10/15/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/15/2001 at 11:44:59. Contact: . move trap and water lines above door way up as far as possable, washer box vent is backgraded, roll toilet vent above flow line. 10/16/2001 4:22:39 PM
|
PLM01-03548
| Water Softner Final | 10/16/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | P | NH |
|
|
matthew- ###-#### water soft no one home left notice and message on machine 10/16/2001 3:50:28 PM
|
PLM01-02849
| Plumbing Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | P | PART |
|
|
###-#### 6" water started from tie in 30' to 45 plus 20 then staked, no thrust block poured 10/16/2001 1:32:42 PM
|
PLM01-03549
| Plumbing Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | P | FAIL |
|
|
###-#### RENEE expose all plumbing by removing insulation, r-13 required between exterior wall and any water piping. 10/16/2001 4:04:42 PM
|
PLM01-03544
| Plumbing Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 12:00:00 AM | P | PART |
|
|
###-#### LAURIE LOCK BOX CODE 1290 ground work in addition in rear ok, talked to owner and she will replumb existing utility room washer and sink to prevent freezing and to use like materials. 10/16/2001 1:16:52 PM
|