FIR05-00486
| INSP-Final Inspection | 10/13/2006 | 10/16/2006 | 10/17/2006 3:29:38 PM | P | FAIL |
|
|
Two items on the previous correction notice dated 2/16/06 are not complete including inadequate dB in the storage room and a penthouse av which is non-functional.
|
FIR04-00745
| INSP-Final Inspection | 10/13/2006 | 10/16/2006 | 10/17/2006 3:26:50 PM | P | FAIL |
|
|
SD are overspaced in the west open area as marked on approved plans, one strobe in a north office as marked on plans is non-functional.
|
FIR06-00244
| INSP-Final Inspection | 10/13/2006 | 10/16/2006 | 10/17/2006 3:24:50 PM | P | FAIL |
|
|
Pull station is missing at the southeast exit from the TI space.
|
FIR06-00639
| INSP-Sprinkler Rough-in | 10/16/2006 | 10/16/2006 | 10/16/2006 5:20:04 PM | P | FAIL |
|
|
Inspection for the 5th floor rough-in only, one head as installed is overspaced as marked on approved plans, need to provide documentation that roofing insulation is sufficient to provide adequate freeze protection for overhead piping run in the joist channels at the deck, will need plan review verification that unsprinklered water closets are acceptable for this NFPA 13 system, overhead hydro for the 5th floor is okay, some field modifications have been made which deviate from the approved set of drawings.
|
FIR06-00262
| INSP-Sprinkler Rough-in/Hydro | 10/16/2006 | 10/16/2006 | 10/16/2006 5:11:21 PM | P | PART |
|
|
UG fire supply line is okay for cover, UG also passed hydrostatic test, noted marked locations for the FDC and WPI appear too low above finish grade.
|
BLD06-01980
| FIRE-Final Inspection | 10/13/2006 | 10/16/2006 | 10/16/2006 4:52:26 PM | P | PASS |
|
|
Fire life safety inspection passed, noted one new ductwork penetration in the north rated corridor which has not been firestopped and will need to be corrected prior to structural final, missing ceiling tile in the file storage room to be installed immediately.
|
FIR06-00511
| INSP-Final Inspection | 10/16/2006 | 10/16/2006 | 10/16/2006 4:48:29 PM | P | PASS |
|
|
Items on previous correction notice have been verified for completion, one remaining overspaced head relocated while on site, final inspection passed, permit finaled.
|
FIR06-00441
| INSP-Sprinkler Rough-in/Hydro | 10/13/2006 | 10/16/2006 | 10/16/2006 12:26:48 PM | A | FAIL |
|
|
AG hydrostatic test failed due to visible leakage and guage pressure loss.
|
FIR06-00608
| INSP-Final Inspection | 10/13/2006 | 10/16/2006 | 10/16/2006 12:24:10 PM | A | PASS |
|
|
Fire alarm work passed final inspection, permit finaled.
|
FIR06-00262
| INSP-Sprinkler Rough-in | 10/16/2006 | 10/16/2006 | 10/16/2006 12:00:00 AM | P | CANC |
|
|
bruce - note: call 1/.2 hr prior to going out 5th floor; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|