Inspections for the day of: Thursday, October 16, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00657 INSP-Sprinkler Rough-in/Hydro10/15/200810/16/200810/16/2008 3:55:41 PMPFAIL
See the city approved plans for the locations of the deficiencies. Unless the piping is installed as per the plans resubmittals will be required.
BLD08-01868 FIRE-Conference10/16/200810/16/200810/16/2008 3:53:54 PMPDONE
I went over storage/racking permit requirements.
FIR08-00620 INSP-Final Inspection10/15/200810/16/200810/16/2008 3:42:09 PMPPASS
permit finaled
BLD08-00601 FIRE-Final Inspection10/16/200810/16/200810/16/2008 2:30:04 PMPFAIL
Provide address and fire extinguisher as per the approved plans and telephone discussion.
BLD08-01055 FIRE-Final Inspection10/15/200810/16/200810/16/2008 1:51:52 PMPPASS
Life safety passed.
BLD07-02458 FIRE-Final Inspection10/15/200810/16/200810/16/2008 10:57:47 AMAFAIL
See the city approved plans for locations where exit discharge lighting and interior emergency lighting is inoperative. Need the project related fire alarm permit finaled as well. Scott Arleno is ok with the fire dept access through the gate on the north side of the building.
FIR08-00557 INSP-Final Inspection10/15/200810/16/200810/16/2008 10:56:22 AMAFAIL
The incorrect sample tubes have been installed and the exhaust tubes are blocked by insulation.
BLD08-02143 FIRE-Final Inspection10/15/200810/16/200810/16/2008 10:55:16 AMAPASS
Life safety passed. She will have the suite number installed before the structural inspection.