FIR08-00657
| INSP-Sprinkler Rough-in/Hydro | 10/15/2008 | 10/16/2008 | 10/16/2008 3:55:41 PM | P | FAIL |
|
|
See the city approved plans for the locations of the deficiencies. Unless the piping is installed as per the plans resubmittals will be required.
|
BLD08-01868
| FIRE-Conference | 10/16/2008 | 10/16/2008 | 10/16/2008 3:53:54 PM | P | DONE |
|
|
I went over storage/racking permit requirements.
|
FIR08-00620
| INSP-Final Inspection | 10/15/2008 | 10/16/2008 | 10/16/2008 3:42:09 PM | P | PASS |
|
|
permit finaled
|
BLD08-00601
| FIRE-Final Inspection | 10/16/2008 | 10/16/2008 | 10/16/2008 2:30:04 PM | P | FAIL |
|
|
Provide address and fire extinguisher as per the approved plans and telephone discussion.
|
BLD08-01055
| FIRE-Final Inspection | 10/15/2008 | 10/16/2008 | 10/16/2008 1:51:52 PM | P | PASS |
|
|
Life safety passed.
|
BLD07-02458
| FIRE-Final Inspection | 10/15/2008 | 10/16/2008 | 10/16/2008 10:57:47 AM | A | FAIL |
|
|
See the city approved plans for locations where exit discharge lighting and interior emergency lighting is inoperative. Need the project related fire alarm permit finaled as well. Scott Arleno is ok with the fire dept access through the gate on the north side of the building.
|
FIR08-00557
| INSP-Final Inspection | 10/15/2008 | 10/16/2008 | 10/16/2008 10:56:22 AM | A | FAIL |
|
|
The incorrect sample tubes have been installed and the exhaust tubes are blocked by insulation.
|
BLD08-02143
| FIRE-Final Inspection | 10/15/2008 | 10/16/2008 | 10/16/2008 10:55:16 AM | A | PASS |
|
|
Life safety passed. She will have the suite number installed before the structural inspection.
|