Inspections for the day of: Thursday, October 16, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00225 General Inspection10/16/200810/16/200810/16/2008 3:25:14 PMPFAIL
Need to sweep up parking lot by 10/17/08 PM. Will re-inspect on 10/20/08.
ESC07-01561 Random Inspection10/16/200810/16/200810/16/2008 3:24:00 PMPPASS
ESC08-00556 BMP Violation10/14/200810/16/200810/16/2008 2:29:32 PMPPART
Need to replace the wattle at the front of lot and still clean up the concrete spoil pile on the lot to the north.
ESC07-00751 BMP Violation10/14/200810/16/200810/16/2008 2:28:34 PMPFAIL
Spoke with the sub division owner due to the family emergency the RP had to take care of. Showed him the concern of violation with the prior correction notice. Wil have it partly done on 10/17/08 and fully complete on 10/20/08.
Will re-inspect on 10/20/08.
ESC07-01460 Conference10/15/200810/16/200810/16/2008 2:26:03 PMADONE
Spoke with owner over general clean up on the project area and getting an understanding on what phase they are in for lot developement.
Also told him to provide a concrete washout pit and clean up lots of concrete and morter wash. Also to provide an RP for the project area.
ESC08-00706 General Inspection10/16/200810/16/200810/16/2008 11:18:19 AMAPASS
Irragation canal that ran through the project area is now piped in. No concerns over the pertaining issue. Site is still in utility phase. Everything is kept contained into project area.
ESC06-00596 Site Final10/16/200810/16/200810/16/2008 10:51:05 AMPDONE
Due to the other active permits. I took the inspection from Troy James.
ESC06-00596 DOC - Permit Finaled10/16/200810/16/200810/16/2008 10:50:03 AMAPASS
ESC08-00267 Conference10/16/200810/16/200810/16/2008 10:20:09 AMADONE
Met with Eric (380) over violation with the erosion control violation pertaain with the project. Refer to his inspection.
ESC07-00003 Tracking Control10/16/200810/16/200810/16/2008 9:06:17 AMAFAIL
Need to clean up all sediemnt and debris off of Shoshone street. Also relocate there concrete washout area due to it being so close to the storm drain inlet. Will re-inspect on 10/17/08 PM.
ESC08-00648 General Inspection10/16/200810/16/200810/16/2008 8:56:01 AMAFAIL
Need to protect stock pile dirt due to the location and the grade of stockpile. Spoke with RP to have it completed by 10/17/08.
ESC08-00824 Site Preparation10/16/200810/16/200810/16/2008 8:39:31 AM PART
Need to clean up sediment off of sidewalks by the end of the day.
ESC08-00465 Tracking Control10/16/200810/16/200810/16/2008 8:28:38 AMAFAIL
Need to clean up tracking from the cack of lot. Spoke with Rp to have it cleaned up by 10/17/08 Am. Will re-inspect on 10/17/08 PM.