FIR09-00282
| INSP-Sprinkler Rough-in/Hydro | 10/15/2009 | 10/16/2009 | 10/16/2009 3:03:17 PM | P | FAIL |
|
|
Hydro test failed. This is just a preliminary hydro since not all of the sprinkler system has been installed.
|
BLD09-01384
| FIRE-Final Inspection | 10/16/2009 | 10/16/2009 | 10/16/2009 2:00:00 PM | P | PASS |
|
|
Life safety passed.
|
FIR09-00487
| INSP-Final Inspection | 10/16/2009 | 10/16/2009 | 10/16/2009 1:17:16 PM | P | PASS |
|
|
Permit finaled
|
FIR09-00561
| INSP-Sprinkler Rough-in/Hydro | 10/15/2009 | 10/16/2009 | 10/16/2009 1:16:08 PM | A | PASS |
|
|
The 5th floor hydro test passed.
|
FIR09-00487
| INSP-Final Inspection | 10/14/2009 | 10/16/2009 | 10/16/2009 1:13:53 PM | A | PASS |
|
|
permit finaled
|
BLD06-00170
| FIRE-Final Inspection | 10/15/2009 | 10/16/2009 | 10/16/2009 8:55:09 AM | A | PASS |
|
|
Life safety passed.
|