ESC09-00377
| Site Preparation | 10/16/2009 | 10/16/2009 | 10/16/2009 4:47:32 PM | P | PART |
|
|
ESC permit sign posted. Wiil use bldg. pad for washout, due to lower elevation. Noted to contractor that they will have to watch for trackout. Will have washout area installed once work on pad begins.
|
BLD09-01007
| BLD-Footing | 10/15/2009 | 10/16/2009 | 10/16/2009 4:45:53 PM | P | PART |
|
|
Rod Phone #: ###-####. North footing along existing stripmall. Contractor will have special inspection.
|
ESC09-00440
| Site Final | 10/16/2009 | 10/16/2009 | 10/16/2009 2:20:39 PM | P | PASS |
|
|
Final stabalization has been completed.
|
BLD09-01164
| BLD-Final | 10/15/2009 | 10/16/2009 | 10/16/2009 2:16:54 PM | P | PASS |
|
|
Patrick Phone #: ###-####
|
BLD09-01164
| DOC - Permit Finaled | 10/16/2009 | 10/16/2009 | 10/16/2009 2:16:43 PM | P | PASS |
|
|
Letter of completetion issued.
|
BLD09-01690
| BLD-Framing/Rough-in | 10/15/2009 | 10/16/2009 | 10/16/2009 1:38:30 PM | P | PART |
|
|
Bill Phone #: ###-####. Nailing on exterior sheating ok on roof deck.
|
ESC09-00360
| Random Inspection | 10/16/2009 | 10/16/2009 | 10/16/2009 1:37:45 PM | P | PASS |
|
|
|
BLD09-00969
| BLD-Energy code compliance | 10/15/2009 | 10/16/2009 | 10/16/2009 1:37:36 PM | P | PASS |
|
|
Bruce Phone #: ###-####
|
BLD09-00969
| BLD-Framing/Rough-in | 10/16/2009 | 10/16/2009 | 10/16/2009 1:37:01 PM | P | PASS |
|
|
Bruce Phone #: ###-####. Mstc straps installed. Also recieved enginering for TJI used for roof joist.
|
ESC09-00613
| Site Preparation | 10/16/2009 | 10/16/2009 | 10/16/2009 11:46:22 AM | A | PASS |
|
|
Site prep ok. ok to proceed eith conc.
|
BLD08-00598
| BLD-Final | 10/15/2009 | 10/16/2009 | 10/16/2009 11:45:49 AM | A | NR |
|
|
John Phone #: ###-####. Needs elec. final.
|