Inspections for the day of: Tuesday, October 16, 2012.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00609 INSP-Conference10/15/201210/16/201210/19/2012 3:50:48 PMADONE
I met with Mary and went over manual pull station placement. Romeo Gervais has approved all three pull stations to be placed at the back exit door.
FIR12-00556 INSP-Final Inspection10/16/201210/16/201210/16/2012 3:12:28 PMPPASS
Permit finaled for the scope of work.
BLD12-01915 FIRE-Conference10/16/201210/16/201210/16/2012 3:02:48 PMPDONE
I spoke to the general contractor about needing to have the fire alarm system functional before final sign off and that modifications are going to be needed due to the new walls being installed which are blocking the strobe coverage.
FIR12-00566 INSP-Final Inspection10/16/201210/16/201210/16/2012 2:20:59 PMPPASS
Permit finaled
FIR12-00583 INSP-Sprinkler Rough-in10/15/201210/16/201210/16/2012 11:43:24 AMAPASS
See the city approved plans for the multiple locations where the undergorund supply lines are ok to cover. Additional fittings have been added and will need to be reflected in the overhead hydraulic calculations.
BLD12-02517 FIRE-Final Inspection10/12/201210/16/201210/16/2012 11:39:05 AMAFAIL
Insulation located at the roof deck is blocking the upright sprinkler head coverage in several locations. Also not all of the ceiling tile has been installed. All other items appear ok.
FIR12-00567 INSP-Final Inspection10/16/201210/16/201210/16/2012 10:14:47 AMAPASS
Permit finaled