MEC14-04468
| Final | 10/15/2014 | 10/16/2014 | 10/16/2014 2:49:09 PM | P | NR |
|
|
Call Eric @ ###-#### for inspection scheduling. Phone #: ###-#### >> Inspection requested via web by Angie Maguire
|
MEC14-04468
| Pressure Test | 10/15/2014 | 10/16/2014 | 10/16/2014 2:48:46 PM | P | NR |
|
|
Pressure test needed for flue on high eff furnace installation. Call Eric @ ###-#### for inspection scheduling. Phone #: ###-#### >> Inspection requested via web by Angie Maguire
|
MEC14-04464
| Final | 10/15/2014 | 10/16/2014 | 10/16/2014 2:43:07 PM | P | PASS |
|
|
Please Call Dwight ###-#### @ Jims Heating Prior To Inspection Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
MEC14-03830
| Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 2:42:33 PM | P | PASS |
|
|
Please Call Dwight ###-#### @ Jims Heating Prior To Inspection Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
MEC14-04480
| Pressure Test | 10/16/2014 | 10/16/2014 | 10/16/2014 2:20:13 PM | P | PART |
|
|
please call Matt 30 mins prior so he can meet you at the job site. ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann ok gas line from side of building to existing line on roof. Need to reinspect gas line to meter base with test.
|
MEC14-04259
| Final | 10/13/2014 | 10/16/2014 | 10/16/2014 2:18:00 PM | P | PART |
|
|
please call Matt 30 mins prior so he can meet you at the job site. ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann ok gas line tie in to existing down to outside wall. Need to reinspect test to gas line to meter base
|
MEC14-04444
| Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 11:12:09 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero
|
MEC14-04444
| Final | 10/16/2014 | 10/16/2014 | 10/16/2014 11:11:38 AM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero
|
MEC14-04266
| Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 10:57:30 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Otero no gas piping installed at this time
|
MEC14-04472
| Rough-in | 10/16/2014 | 10/16/2014 | 10/16/2014 10:32:49 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Jon VanderStelt no manual j onsite, missing screws to range exhaust duct joints, air handler is required to have disconnect switch at air handler
|
MEC14-04380
| Final | 10/9/2014 | 10/16/2014 | 10/16/2014 10:10:04 AM | P | PASS |
|
|
INSTALLER JASON ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich already approved by alan 10-15-14
|
MEC14-04380
| Pressure Test | 10/9/2014 | 10/16/2014 | 10/16/2014 10:09:04 AM | A | PASS |
|
|
P/T IS FOR FLUE INSTALLER JASON ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich alreaedy approved by alan 10-15-14
|
MEC14-04390
| Final | 10/15/2014 | 10/16/2014 | 10/16/2014 9:58:17 AM | A | PASS |
|
|
Please call Pat the homeowner when in route to her home Phone #: ###-#### >> Inspection requested via web by Carolyn Rudd
|
MEC14-03961
| Rough-in | 10/14/2014 | 10/16/2014 | 10/16/2014 9:38:30 AM | A | PASS |
|
|
Homeowner; Tim Holmes, ###-#### >> Inspection requested via web by Jason Robinson
|
MEC14-03961
| Final | 10/16/2014 | 10/16/2014 | 10/16/2014 9:38:18 AM | P | PASS |
|
|
Homeowner; Tim Holmes, ###-#### >> Inspection requested via web by Jason Robinson
|
MEC14-04393
| Pressure Test | 10/13/2014 | 10/16/2014 | 10/16/2014 9:26:35 AM | A | NR |
|
|
P/T IS FOR FLUE installer brandan ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
MEC13-05287
| Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 9:05:35 AM | A | PART |
|
|
4th floor restroom & re-inspection for Makers Studio mech case for duct collator (also on 4th floor). Onsite contact: Rob Butler. Phone #: ###-#### >> Inspection requested via web by Melissa Kaae Ok to cover ceiling at 4th floor restrooms after access door is framed for access to motor at fire damper. Need to remove rubber gasket at dust collector floor sweep and install approved materials.
|
MEC14-04063
| Final | 10/16/2014 | 10/16/2014 | 10/16/2014 8:20:01 AM | P | PASS |
|
|
|
MEC14-01954
| Rough-in | 10/15/2014 | 10/16/2014 | 10/15/2014 9:24:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shelia Gibson ok ceiling 4th floor lobby
|