ELE19-03074
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 3:26:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steven M Bandkau Jr...pwdr bath, mst closet, living rm, office, and kitchen...rough complete
|
ELE19-03883
| Final | 10/16/2019 | 10/16/2019 | 10/16/2019 2:31:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Winters LLC...surface wiring...GFCI protection, bonding, and wiring complete..ok to final
|
ELE19-02351
| Conference | 10/16/2019 | 10/16/2019 | 10/16/2019 2:03:47 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins...discussed starting of wiring on interior of 2 story building...staying in interior with no outside perimeter wiring..ok
|
ELE19-03970
| Conference | 10/16/2019 | 10/16/2019 | 10/16/2019 1:22:53 PM | P | PASS |
|
|
Call half hour before to meet there // Mike Phone #: ###-####...discussed wiring shop with new service...uffer good...pamphlet given...competent in doing work...future consult when framed
|
ELE19-03928
| Rough-In Permanent Service | 10/16/2019 | 10/16/2019 | 10/16/2019 12:33:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt...corrections made rough ok to cover p/s u/g new ok
|
ELE19-03856
| Permanent Service | 10/15/2019 | 10/16/2019 | 10/16/2019 12:19:35 PM | P | PASS |
|
|
Damion Phone #: ###-####..p/s u/g connect ok to new location
|
ELE19-03177
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 11:14:57 AM | A | PASS |
|
|
john Phone #: ###-####...rough ok to cover...new vanities...outlets and lights off existing circuits
|
ELE19-03988
| Final | 10/15/2019 | 10/16/2019 | 10/16/2019 10:37:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley...use of existing circuits and down sizing to need size...240V to 120V...ok to final
|
ELE19-03773
| Final | 10/15/2019 | 10/16/2019 | 10/16/2019 10:15:01 AM | A | PASS |
|
|
Added outlets for the server room, added outlets for a soda machine. Call for specifics. Phone #: ###-#### Inspection requested via web by Greg Idsinga...circuits fished in walls-M/C wiring..GFCI protection were needed...ok to final
|
ELE18-04746
| Final | 10/16/2019 | 10/16/2019 | 10/16/2019 9:51:29 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...breakroom compete, outlet conference rm, and cubicle circuit labelling
|
ELE18-04746
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 9:50:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...rough-in complete of project...new offices, exam rms, and misc walls
|
ELE19-03404
| Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 8:58:15 AM | A | PASS |
|
|
Looking for rough cover and to see if you will require any additional work before final. Phone #: ###-#### Inspection requested via web by Cevyn Recla...rough ok to cover...outlets added and wired in open walls where required
|
ELE19-02689
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 8:17:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Downs...1st thing in morning 8AM...rescheduled from previous day...exterior outlets, bedroom dedicated outlet, and garage outlets/switches below panel-ok to cover/complete
|